Safety information search results
Filter your results
Building or structure type
- Bridges (56)
- Buildings
(444)
- Agricultural buildings (8)
- Car parks (16)
- Commercial (40)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (34)
- Health care (14)
- Higher-risk buildings (6)
- Industrial buildings (19)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (14)
- Recreational buildings (8)
- Residential (142)
- Stadiums (3)
- Storage buildings (9)
- Tall buildings (20)
- Theatres & other entertainment buildings (9)
- Transport buildings (6)
- Buried pipes & culverts (6)
- Floating structures (1)
- Freestanding walls (5)
- Marine structures (2)
- Masts & towers (17)
- Offshore structures (2)
- Railways (18)
- Reservoirs & dams (2)
- Retaining structures (40)
- Roads (12)
- Sewers (4)
- Temporary structures (40)
- Tunnels (3)
Materials
Project or lifecycle stage
Design
- BIM (5)
- Computational design (12)
- Design: quality management (61)
- Design calculations (71)
- Design conceptualisation (25)
- Design detailing (95)
- Design drawings (28)
- Design loads (96)
- Design software (30)
- Dynamics (9)
- Fire safety design (15)
- Resilience (23)
- Robustness (57)
- Structural design (120)
- Sustainability (6)
Fire incident response
Project type
- Alteration & conversion project (41)
- Assessment project [sub-heading only] (20)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (242)
- Demolition project (14)
- Excavation (16)
- Extension project (21)
- Fire safety assessment (2)
- Groundworks project (2)
- Maintenance project (2)
- New build (106)
- Refurbishment (19)
- Remediation project (22)
- Repair project (10)
- Strengthening project (9)
- Structural assessment (29)
- Underpinning project (4)
Construction period
Method of construction
Elements & systems
- Arch (8)
- Balconies (16)
- Balustrades (22)
- Basements (13)
- Beams (80)
- Bracing (23)
- Cables (3)
- Canopies (7)
- Ceilings (23)
- Cladding (38)
- Columns (44)
- Fasteners & connections (161)
- Fences (1)
- Fire exit doors (2)
- Fire protection (14)
- Foundations (37)
- Insulation (10)
- Light gauge steel framing (6)
- Lintels (4)
- Padstones (5)
- Parapets (10)
- PV panels (2)
- Roofs (64)
- Sandwich panels (2)
- Shear walls (3)
- Signs (4)
- Slabs (54)
- Tendons (2)
- Trusses (8)
- Wall head restraints (3)
- Walls (106)
- Wall ties (13)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
- CROSS-UK [sub-heading only]
(53)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (3)
- Health and Safety Executive (HSE) (16)
- Local Authority Building Control (LABC) (24)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (8)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (9)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (390)
- CROSS Newsletter (235)
- (-) CROSS Safety Report (707)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (2)
- Safety information [sub-heading only] (1)
CROSS regions
Change of use to care home
A report has been received relating to the intended change of use of a large building.
6 June 2022
CROSS Safety Report
Report ID: 1078
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
The stack effect and considerations for smoke control
A reporter believes real-world tests demonstrate that existing smoke control systems may not suitably account for typical winter stack effect conditions.
20 November 2023
CROSS Safety Report
Report ID: 1250
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Scottish tenements
A reporter raises concerns about carrying out alterations to old tenement buildings in Scotland.
1 July 2006
CROSS Safety Report
Report ID: 26
Region: CROSS-UK
Steel portal frame erection
A reporter describes how a steel portal frame collapsed during its erection.
1 March 2006
CROSS Safety Report
Report ID: 20
Region: CROSS-UK
Timber design concerns
A reporter says what he has seen of the quality of the structural engineering design of roofs in many hundreds of projects is lamentably low.
1 March 2006
CROSS Safety Report
Report ID: 21
Region: CROSS-UK
Collapse of old masonry walls
There were reports of the collapse of several old masonry walls associated with adjacent construction work.
1 November 2005
CROSS Safety Report
Report ID: 12
Region: CROSS-UK