Safety information search results
Filter your results
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS Newsletter (10)
- CROSS Safety Report (17)
- News [sub-heading only] (2)
CROSS regions
Inadequate billets used in precast concrete connections
Whilst completing a third-party design appraisal, a correspondent found that solid steel billets intended to form the primary shear transfer mechanism between concrete beams and columns were insufficient for this purpose.
1 April 2019
CROSS Safety Report
Report ID: 705
Region: CROSS-UK
Serious safety failings of high level lattice girder walkways
A reporter discusses extremely serious safety failings with the construction of two new high level lattice girder walkways in the fly tower of a theatre.
1 January 2018
CROSS Safety Report
Report ID: 697
Region: CROSS-UK
Dangerous modification during construction of five storey block of flats
A reporter was asked to investigate a five storey timber framed block of flats after the leaseholder of the top floor reported gaps appearing between oak floorboards.
1 January 2018
CROSS Safety Report
Report ID: 699
Region: CROSS-UK
Unconnected steel beam connection
A reporter describes how they came across a completely inadequate steel connection while attending site for another matter.
1 October 2017
CROSS Safety Report
Report ID: 646
Region: CROSS-UK
Spalled concrete falls from rear face of drilled hole 26 floors up
A reporter describes how during drilling, an operator over drilled the hole causing spalling on the back face of the concrete.
1 July 2017
CROSS Safety Report
Report ID: 639
Region: CROSS-UK
Weld de-specification without design approval
A reporter's firm was engaged as fabricators for a main contractor and asked by them to de-specify full and partial penetration butt welds and replace them with fillet welds without approval from the main design engineer.
14 October 2020
CROSS Safety Report
Report ID: 845
Region: CROSS-UK
Contractor uses incorrect fixing bolts for masonry support angles
A correspondent noticed that proprietary masonry support angles specified to support the outer leaf of masonry had been incorrectly connected to the steel beam using carriage bolts.
1 July 2019
CROSS Safety Report
Report ID: 794
Region: CROSS-UK