Safety information search results
Filter your results
Building height
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK [sub-heading only] (16)
- CROSS Newsletter (12)
- CROSS Safety Report (29)
CROSS regions
Failure of cast-in wire lifting loops on manhole cover slabs
A cast-in wire lifting loop failed when lifting a 4m diameter precast manhole cover slab into place.
23 May 2022
CROSS Safety Report
Report ID: 629
Region: CROSS-UK
Temporary instability of columns
Concerns were raised by a reporter on the temporary stability of concrete columns during construction.
2 February 2023
CROSS Safety Report
Report ID: 872
Region: CROSS-UK
Incorrect lifting system used for precast concrete stair elements
A reporter was asked to inspect a precast concrete stair unit which was exhibiting cracking around the lifting anchor locations after being de-moulded.
13 December 2022
CROSS Safety Report
Report ID: 883
Region: CROSS-UK
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Dislodged finger plate on highway bridge
A correspondent received a report about a 1.5m long section of a steel finger plate expansion joint on a highway bridge that had been inadequately fixed and became dislodged.
1 February 2020
CROSS Safety Report
Report ID: 879
Region: CROSS-AUS
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS
Safety concern about the design of thin concrete walls
The reporter raises their concern about the design of thin concrete load-bearing walls, sometimes supporting 10 or more storeys.
1 July 2019
CROSS Safety Report
Report ID: 815
Region: CROSS-AUS
Inadequate bolted connections supporting stairs
Concerns are raised over the safe design and installation of rolled steel angles (RSA) used to support heavy precast stair and landing units.
1 April 2017
CROSS Safety Report
Report ID: 615
Region: CROSS-UK