Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (17)
- CROSS Newsletter (8)
- CROSS Safety Report (32)
- News [sub-heading only] (2)
- Third party article (1)
- Third party content (1)
CROSS regions
Unstable pre-slung rebar bundles
A contractor has issued a safety alert about pre-slung loads of rebar which has resulted in loads being out of balance when unloaded on site.
1 April 2016
CROSS Safety Report
Report ID: 565
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Precast concrete canopies in housing
A reporter warns that precast concrete cantilever canopies which are slender and monolithic with lintels over entrance doorways can be vulnerable to sudden collapse.
1 January 2009
CROSS Safety Report
Report ID: 126
Region: CROSS-UK
Accidental partial demolition of a beam
During a site visit, the permanent works design engineer noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
6 April 2023
CROSS Safety Report
Report ID: 855
Region: CROSS-UK
CARES Alert: Unregulated reinforcement continuity systems
CARES is investigating unregulated reinforcement continuity systems entering the construction supply chain.
27 April 2021
Third party content
Publisher: CARES
Punching shear design spreadsheets
This is a technical note from a reporter about the methods their firm uses for punching shear design because there was concern about punching shear design spreadsheets possibly leading to potentially unsafe situations. .
28 March 2023
CROSS Safety Report
Report ID: 830
Region: CROSS-UK
Defects in tapered thread reinforcement bars for coupling
A reporter highlights how B500 reinforcing bars were observed to have visually different tapered threads cut into the bars after delivered to site.
1 July 2019
CROSS Safety Report
Report ID: 844
Region: CROSS-UK
Missing punching shear reinforcement in concrete slabs
A reporter raises concerns of how two separate engineers observed the omission of design punching shear reinforcement prior to slab pours being undertaken on two different sites.
1 April 2020
CROSS Safety Report
Report ID: 906
Region: CROSS-UK
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK
Unconservative design of flat slab due to software modelling issues
A reporter discusses how a design/modelling problem caused an under-designed reinforced concrete (RC) slab to be constructed.
1 April 2020
CROSS Safety Report
Report ID: 886
Region: CROSS-UK