Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (4)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK [sub-heading only] (25)
- CROSS Newsletter (17)
- CROSS Safety Alert (1)
- CROSS Safety Report (29)
- News [sub-heading only] (4)
CROSS regions
Chain hoist problem
A reporter raises concerns after brand new proprietary hoists had to be returned to the manufacturer for remedial works.
1 April 2013
CROSS Safety Report
Report ID: 317
Region: CROSS-UK
Concern about bridge hangers
A reporter is concerned that a failure in recent years involving the cast connections at each end of vertical bars, which connected to a bow string arch at one end and to a bridge deck at the other, may be in use elsewhere.
1 July 2012
CROSS Safety Report
Report ID: 222
Region: CROSS-UK
Defective imported scaffold ties
On a contract where multi lift access scaffolds had been installed for a period of up to 18 months in an exposed coastal location, it was found by a reporter on one of the regular inspections that some of the scaffold ties had failed.
1 April 2011
CROSS Safety Report
Report ID: 230
Region: CROSS-UK
Verification of inspection documents
A reporter raises concern after evidence had recently been received that an increased number of ‘copies’ of the supplier’s inspection certificates for heavy plate products had been modified from the original state or falsified.
1 April 2011
CROSS Safety Report
Report ID: 226
Region: CROSS-UK
Quality of some imported steel components
Concerns are raised that the construction industry is procuring many materials such as steel plates, structural sections, and metal castings from outside the UK and that these are often found to have some issues in meeting specification.
1 January 2013
CROSS Safety Report
Report ID: 259
Region: CROSS-UK
Incorrect CE-marking of products
A reporter from Germany raises concerns about wrongly declared and/or insufficient Declaration of Performance (DoPs) for products according to the harmonized European standards with CE-marking.
1 January 2020
CROSS Safety Report
Report ID: 835
Region: CROSS-UK
Incorrect load testing of steel lifting frames
On two occasions, a reporter has experienced issues with load tests on steel lifting frames and wonders how many other load tests may have been carried out incorrectly without being noticed.
1 April 2019
CROSS Safety Report
Report ID: 786
Region: CROSS-UK
Inadequate product testing for shear studs
A reporter raises concerns about a manufacturer providing testing information for a variant product based on a university student Master’s dissertation.
1 April 2019
CROSS Safety Report
Report ID: 790
Region: CROSS-UK
Products installed without CE-marking due to lower cost
Another report from Germany concerns products that have been delivered and installed on a construction site without any CE marking and Declaration of Performance (DoP) at all.
1 January 2020
CROSS Safety Report
Report ID: 836
Region: CROSS-UK
No structural design for steel portal frame building
A reporter is concerned that, in some cases, no structural design is carried out for steel portal framed buildings.
1 January 2020
CROSS Safety Report
Report ID: 866
Region: CROSS-UK