Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (3)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (56)
- Demolition project (2)
- Excavation (2)
- Extension project (2)
- New build (36)
- Refurbishment (1)
- Remediation project (3)
- Repair project (2)
- Strengthening project (1)
- Structural assessment (1)
Method of construction
Elements & systems
- Balconies (4)
- Balustrades (6)
- Basements (1)
- Beams (34)
- Bracing (11)
- Cables (1)
- Canopies (1)
- Ceilings (1)
- Cladding (5)
- Columns (17)
- Fasteners & connections (60)
- Fire protection (3)
- Foundations (8)
- Insulation (1)
- Light gauge steel framing (6)
- Lintels (1)
- Padstones (4)
- Parapets (3)
- PV panels (1)
- Roofs (8)
- Signs (1)
- Slabs (2)
- Trusses (2)
- Walls (7)
- Wall ties (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (5)
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 4 (5)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (4)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (4)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (79)
- CROSS-US Newsletter 3 (2)
- CROSS Newsletter (57)
- CROSS Safety Report (124)
- CROSS Topic Paper (1)
- News [sub-heading only] (21)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Steel portal frame erection
A reporter describes how a steel portal frame collapsed during its erection.
1 March 2006
CROSS Safety Report
Report ID: 20
Region: CROSS-UK
Stud framing with self-tapping screws
A reporter raises concerns about contractors not using the specified screws for constructing metal stud frame walls.
1 November 2005
CROSS Safety Report
Report ID: 11
Region: CROSS-UK
Latent shear stud defects
Shear studs appeared to be satisfactory when checked with the standard pull-over to five degrees but when hit with a hammer they snapped off.
1 November 2005
CROSS Safety Report
Report ID: 13
Region: CROSS-UK
Very slender props
A reporter noticed prop that did not have ties installed while carrying out a site inspection.
1 July 2007
CROSS Safety Report
Report ID: 34
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Follow up to Liquid Metal Assisted Cracking (LMAC)
A recent case involving cracking around holes in large structural components was detected immediately after galvanising as a result of the team being aware of the need for post galvanising inspection.
1 July 2008
CROSS Safety Report
Report ID: 105
Region: CROSS-UK
Car park mesh barriers
A reporter is concerned that barrier systems that do not comply with the current standards may be used in car parks throughout Britain.
1 October 2008
CROSS Safety Report
Report ID: 120
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Freezing splits galvanised SHS columns
Concerns were raised after several square hollow section members split vertically on a partially complete construction site.
1 April 2012
CROSS Safety Report
Report ID: 253
Region: CROSS-UK