Safety information search results
Filter your results
Building or structure type
- Bridges (29)
- Buildings
(107)
- Agricultural buildings (6)
- Car parks (5)
- Commercial (9)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (4)
- Health care (1)
- Industrial buildings (6)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (6)
- Recreational buildings (3)
- Residential (26)
- Stadiums (4)
- Storage buildings (5)
- Tall buildings (3)
- Theatres & other entertainment buildings (2)
- Transport buildings (2)
- Masts & towers (7)
- Railways (6)
- Retaining structures (6)
- Roads (1)
- Temporary structures (11)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (5)
- Design: quality management (20)
- Design calculations (23)
- Design conceptualisation (10)
- Design detailing (46)
- Design drawings (12)
- Design loads (22)
- Design software (8)
- Dynamics (4)
- Fire safety design (4)
- Resilience (7)
- Robustness (19)
- Structural design (67)
- Sustainability (1)
Fire incident response
Project type
- Alteration & conversion project (9)
- Assessment project [sub-heading only] (5)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (77)
- Demolition project (2)
- Excavation (3)
- Extension project (7)
- New build (41)
- Refurbishment (6)
- Remediation project (6)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (8)
Method of construction
Elements & systems
- Balconies (7)
- Balustrades (10)
- Basements (1)
- Beams (51)
- Bracing (13)
- Cables (4)
- Canopies (2)
- Ceilings (2)
- Cladding (9)
- Columns (26)
- Fasteners & connections (81)
- Fire protection (4)
- Foundations (7)
- Insulation (2)
- Light gauge steel framing (5)
- Lintels (2)
- Padstones (4)
- Parapets (2)
- PV panels (1)
- Roofs (14)
- Shear walls (1)
- Slabs (5)
- Tendons (1)
- Trusses (3)
- Walls (14)
- Wall ties (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 4 (5)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (3)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 23 (4)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (4)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (4)
- CROSS-UK Newsletter 51 (4)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (4)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (6)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (120)
- CROSS Newsletter (87)
- CROSS Safety Alert (4)
- CROSS Safety Report (196)
- CROSS Topic Paper (2)
- News [sub-heading only] (30)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Example of small temporary stage structure
This is an example of a small stage that is potentially unstable.
1 January 2013
CROSS Safety Report
Report ID: 302
Region: CROSS-UK
Further issues with freezing and galvanised hollow sections
A reporter was involved in correcting a cold formed galvanised square hollow section (SHS) four storey balcony structure where longitudinal splits formed in at least two of the four columns.
1 January 2014
CROSS Safety Report
Report ID: 314
Region: CROSS-UK
Further concerns about competence
A reporter raises concerns about competency, and the points raised demonstrate, says the reporter, a poor grasp first-principles on the part of many designers.
1 July 2013
CROSS Safety Report
Report ID: 339
Region: CROSS-UK
Nuts falling from tension glazing system
A reporter raises concerns about the fixings used in a tension glazing system.
1 July 2013
CROSS Safety Report
Report ID: 340
Region: CROSS-UK
Policing of CE marking on steelwork
A reporter has a question regarding structural steel safety, particularly on steel gantry systems supporting lifting equipment.
1 July 2015
CROSS Safety Report
Report ID: 510
Region: CROSS-UK
Post-fixed RC anchors - assumptions lead to unsafe design
A reporter raises concerns that engineers may be using post-fixed anchors without complying with the manufacturer's guidance or ensuring that their design assumptions are applicable.
1 January 2015
CROSS Safety Report
Report ID: 443
Region: CROSS-UK
Issues with imported steel
Defective steel, says a reporter, was found in a major retail store where the material had been imported from a supplier overseas.
1 October 2014
CROSS Safety Report
Report ID: 474
Region: CROSS-UK
Dangerous alterations to steel beam supports
A local authority building control officer went to site and witnessed on an upper floor that the columns had been removed out of sequence, before the new frame had been constructed.
1 October 2015
CROSS Safety Report
Report ID: 479
Region: CROSS-UK
Freeze and thaw of another RHS
Further to reports about the freezing of water in hollow sections a correspondent has sent photos of a section of mild steel RHS that was removed from a bridge and shows the bulging that can occur.
1 January 2015
CROSS Safety Report
Report ID: 485
Region: CROSS-UK
Bolt failures due to hydrogen embrittlement
A reporter recalls how, in the 1970s while working on a bridge refurbishment project, several new zinc electro-plated bolts failed suddenly, and often shortly after installation.
1 April 2015
CROSS Safety Report
Report ID: 490
Region: CROSS-UK