Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (24)
- CROSS Newsletter (21)
- CROSS Safety Report (35)
- News [sub-heading only] (3)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Excessive deflection of spliced steel beam
A long-span primary steel beam deflects excessively at its splice during concreting of the floor slab.
30 August 2022
CROSS Safety Report
Report ID: 1111
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Possible galvanising concern
A reporter has a question about using galvanised steel poles for the members of dome structures.
1 November 2006
CROSS Safety Report
Report ID: 48
Region: CROSS-UK
Liquid metal assisted cracking (LMAC)
A reporter raises concerns about the risk of liquid metal assisted cracking during the hot dip galvanising process.
1 November 2006
CROSS Safety Report
Report ID: 45
Region: CROSS-UK
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Follow up to Liquid Metal Assisted Cracking (LMAC)
A recent case involving cracking around holes in large structural components was detected immediately after galvanising as a result of the team being aware of the need for post galvanising inspection.
1 July 2008
CROSS Safety Report
Report ID: 105
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Freezing splits galvanised SHS columns
Concerns were raised after several square hollow section members split vertically on a partially complete construction site.
1 April 2012
CROSS Safety Report
Report ID: 253
Region: CROSS-UK
Steel connector failures and forged certificates
According to a reporter, some suppliers are receiving components that are accompanied by certificates that are potentially false or forged.
1 July 2012
CROSS Safety Report
Report ID: 254
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.