Safety information search results
Filter your results
Building height
Materials
Project or lifecycle stage
Design
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (26)
- CROSS Newsletter (15)
- CROSS Safety Report (48)
- CROSS Topic Paper (2)
- News [sub-heading only] (1)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Structural corrosion in a swimming pool building causes concern
A survey showed severe corrosion of previously repaired steelwork columns adjacent to a public swimming pool.
30 July 2021
CROSS Safety Report
Report ID: 1004
Region: CROSS-UK
Brick slips falling from height
A reporter describes cases of brick slips falling from height due to adhesive failures and considers that there is a danger to the public.
13 August 2021
CROSS Safety Report
Report ID: 1017
Region: CROSS-UK
Sudden failure of storage silo
A 5,000 ton capacity storage silo containing ground granulated blast-furnace slag (ggbs) split apart suddenly and without warning onsite at a concrete production facility.
14 December 2021
CROSS Safety Report
Report ID: 1045
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Elliot Lake mall collapse
In June 2012 part of the roof of a thirty two year old Mall in Ontario, Canada collapsed killing two people and injuring nineteen.
1 December 2014
CROSS Topic Paper
Region: CROSS-UK
Proper design and use of cold rolled steel frames
A reporter has been designing structures in cold rolled steel for approximately twenty years, mainly portal frame buildings, and some concerns.
1 January 2008
CROSS Safety Report
Report ID: 93
Region: CROSS-UK
Issues for CDM co-ordinators
A reporter feels that a lack of finance is being invested in the long-term maintenance for structures and that this is a difficult issue for the CDM co-ordinator to raise with the client.
1 January 2009
CROSS Safety Report
Report ID: 118
Region: CROSS-UK
Deadly retaining wall
A blockwork retaining wall, about 2.5 metres high suddenly collapsed causing a fatality.
1 July 2009
CROSS Safety Report
Report ID: 134
Region: CROSS-UK
Assessment and inspection of buildings
SCOSS has been concerned for some time (2003) at the potential for deterioration of buildings and other facilities during their working lives such that there results an inadequate reserve of strength against collapse of the whole or part of the structure.
1 September 2010
CROSS Topic Paper
Region: CROSS-UK
Public art structures
Engineers have noticed a trend and raise concerns over more works of ‘Public Art’ being placed near to highways and in cities.
1 April 2009
CROSS Safety Report
Report ID: 136
Region: CROSS-UK