Safety information search results
Filter your results
Building or structure type
- Bridges (32)
- Buildings
(229)
- Agricultural buildings (1)
- Car parks (11)
- Commercial (17)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (9)
- Health care (3)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Public, religious & civic buildings (6)
- Recreational buildings (5)
- Residential (65)
- Stadiums (2)
- Storage buildings (3)
- Tall buildings (7)
- Theatres & other entertainment buildings (5)
- Transport buildings (2)
- Buried pipes & culverts (2)
- Freestanding walls (1)
- Masts & towers (10)
- Railways (6)
- Reservoirs & dams (1)
- Retaining structures (23)
- Roads (7)
- Sewers (3)
- Temporary structures (27)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (3)
- Design: quality management (24)
- Design calculations (26)
- Design conceptualisation (10)
- Design detailing (56)
- Design drawings (21)
- Design loads (45)
- Design software (7)
- Dynamics (3)
- Fire safety design (8)
- Resilience (6)
- Robustness (22)
- Structural design (60)
- Sustainability (2)
Fire incident response
Project type
- Alteration & conversion project (21)
- Assessment project [sub-heading only] (7)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (173)
- Demolition project (4)
- Excavation (14)
- Extension project (12)
- Groundworks project (3)
- Maintenance project (1)
- New build (95)
- Refurbishment (9)
- Remediation project (13)
- Repair project (6)
- Strengthening project (4)
- Structural assessment (8)
- Underpinning project (3)
Construction period
Elements & systems
- Arch (2)
- Balconies (8)
- Balustrades (13)
- Basements (7)
- Beams (52)
- Bracing (14)
- Cables (1)
- Canopies (1)
- Ceilings (11)
- Cladding (24)
- Columns (26)
- Fasteners & connections (109)
- Fire protection (7)
- Foundations (29)
- Insulation (6)
- Light gauge steel framing (3)
- Lintels (3)
- Padstones (5)
- Parapets (4)
- PV panels (1)
- Roofs (33)
- Sandwich panels (1)
- Signs (3)
- Slabs (31)
- Tendons (1)
- Trusses (5)
- Wall head restraints (2)
- Walls (65)
- Wall ties (10)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (3)
- CROSS-UK Newsletter 4 (7)
- CROSS-UK Newsletter 5 (4)
- CROSS-UK Newsletter 6 (5)
- CROSS-UK Newsletter 7 (3)
- CROSS-UK Newsletter 8 (4)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 11 (3)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (4)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (5)
- CROSS-UK Newsletter 32 (6)
- CROSS-UK Newsletter 33 (4)
- CROSS-UK Newsletter 34 (6)
- CROSS-UK Newsletter 35 (6)
- CROSS-UK Newsletter 36 (3)
- CROSS-UK Newsletter 37 (5)
- CROSS-UK Newsletter 38 (6)
- CROSS-UK Newsletter 39 (5)
- CROSS-UK Newsletter 40 (3)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (9)
- CROSS-UK Newsletter 43 (5)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (4)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (6)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (6)
- CROSS-UK Newsletter 56 (5)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (6)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (4)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (240)
- CROSS Newsletter (146)
- CROSS Safety Alert (1)
- CROSS Safety Report (377)
- CROSS Topic Paper (3)
- News [sub-heading only] (47)
- Safety information from CROSS [sub-heading only] (1)
- Third party article (1)
- Third party content (1)
CROSS regions
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK
CARES Alert: Unregulated reinforcement continuity systems
CARES is investigating unregulated reinforcement continuity systems entering the construction supply chain.
27 April 2021
Third party content
Publisher: CARES
Brick slips falling from height
A reporter describes cases of brick slips falling from height due to adhesive failures and considers that there is a danger to the public.
13 August 2021
CROSS Safety Report
Report ID: 1017
Region: CROSS-UK
Unsafe working platform
A reporter came across an access platform supported next to an excavated foundation with unstable sides while carrying out an inspection on site.
10 March 2022
CROSS Safety Report
Report ID: 1019
Region: CROSS-UK
Unsafe excavation practices
A builder undermined the existing footing of a masonry wall without being aware of the risks.
30 July 2021
CROSS Safety Report
Report ID: 1026
Region: CROSS-UK
Problem when launching a prestressed beam
When lowered onto its elastomeric bearings, a 40m span post-tensioned ‘I’ beam started to move towards the outer edge of the pier cap.
30 July 2021
CROSS Safety Report
Report ID: 1027
Region: CROSS-UK
Column stability during erection
A reporter highlights the importance of ensuring steel columns are temporarily supported until they are sufficiently tied and supported by the permanent structure.
13 December 2021
CROSS Safety Report
Report ID: 1038
Region: CROSS-UK
Fire compartmentation detailing issues
Two reports have been received concerning fire compartmentation detailing issues; one on the incorrect installation of fire batts and the other on the incorrect use of intumescent material.
18 August 2021
CROSS Safety Report
Report ID: 1039
Region: CROSS-UK
Roof collapse at a social club
This is a report about a roof collapse that occurred, in about 1985, because only half as many parallel faced timber roof trusses were installed as there should have been.
30 June 2022
CROSS Safety Report
Report ID: 942
Region: CROSS-UK
Masonry support prop adaptor
A reporter has written to say that when carrying out temporary needling and propping of openings formed in masonry walls one of the most important aspects is to ensure that the props are concentrically loaded and plumb.
1 July 2006
CROSS Safety Report
Report ID: 32
Region: CROSS-UK