Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (11)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (1)
- (-) Construction project [sub-heading only] (46)
- Demolition project (1)
- Excavation (1)
- Extension project (2)
- Maintenance project (3)
- New build (10)
- Refurbishment (7)
- Remediation project (12)
- Repair project (5)
- Strengthening project (4)
- Structural assessment (5)
Method of construction
Structural form
Elements & systems
- Arch (3)
- Balconies (2)
- Balustrades (5)
- Beams (4)
- Bracing (2)
- Ceilings (1)
- Cladding (6)
- Columns (1)
- Fasteners & connections (9)
- Fire protection (2)
- Insulation (2)
- Light gauge steel framing (1)
- Lintels (1)
- Parapets (2)
- PV panels (1)
- Roofs (6)
- Shear walls (1)
- Slabs (5)
- Wall head restraints (1)
- Walls (10)
- Wall ties (1)
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (4)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (3)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (24)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (16)
- CROSS Safety Report (46)
- News [sub-heading only] (4)
CROSS regions
Dangerous modification during construction of five storey block of flats
A reporter was asked to investigate a five storey timber framed block of flats after the leaseholder of the top floor reported gaps appearing between oak floorboards.
1 January 2018
CROSS Safety Report
Report ID: 699
Region: CROSS-UK
Parapet wall collapse
The sudden failure of parapet coping stones on an old two storey industrial building caused the stones to fall onto a road and pavement below.
1 January 2018
CROSS Safety Report
Report ID: 711
Region: CROSS-UK
Who takes responsibility for preventing a failure?
After reading the safety alert on Hazard identification for structural design, a reporter shares their views how various parties involved with structural safety sometimes see their responsibilities.
1 July 2018
CROSS Safety Report
Report ID: 704
Region: CROSS-UK
Unsafe removal of internal walls
A reporter was requested to advise on the removal of some internal walls in a decades’ old multi storey block of council flats after they were removed.
1 October 2018
CROSS Safety Report
Report ID: 714
Region: CROSS-UK
Dangerous glass infill panels on balustrade
A reporter has expressed their concern about the structural stability of cantilever glass infill panels between a steel post and handrail balustrade system at a high-level apartment block.
1 January 2019
CROSS Safety Report
Report ID: 741
Region: CROSS-UK
Dangerously defective glass smoke screens
A reporter was asked to investigate the spontaneous failure of glass smoke control screens at a major retail store.
1 July 2018
CROSS Safety Report
Report ID: 734
Region: CROSS-UK