Safety information search results
Filter your results
Building or structure type
- Bridges (23)
- Buildings
(134)
- Agricultural buildings (6)
- Car parks (10)
- Commercial (12)
- Education, science & art buildings (13)
- Health care (2)
- Higher-risk buildings (4)
- Industrial buildings (5)
- LPS buildings (3)
- Public, religious & civic buildings (6)
- Recreational buildings (6)
- Residential (29)
- Stadiums (1)
- Storage buildings (4)
- Tall buildings (8)
- Theatres & other entertainment buildings (5)
- Transport buildings (4)
- Buried pipes & culverts (4)
- Freestanding walls (4)
- Marine structures (1)
- Masts & towers (7)
- Offshore structures (1)
- Railways (12)
- Reservoirs & dams (1)
- Retaining structures (10)
- Roads (9)
- Sewers (1)
- Temporary structures (9)
- Tunnels (2)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (10)
- Assessment project [sub-heading only] (15)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (42)
- Demolition project (1)
- Excavation (1)
- Extension project (2)
- Fire safety assessment (1)
- Maintenance project (1)
- New build (11)
- Refurbishment (6)
- Remediation project (12)
- Repair project (6)
- Strengthening project (4)
- Structural assessment (21)
Construction period
Method of construction
Structural form
Elements & systems
- Arch (6)
- Balconies (6)
- Balustrades (10)
- Basements (1)
- Beams (11)
- Bracing (6)
- Cables (2)
- Canopies (5)
- Ceilings (18)
- Cladding (19)
- Columns (8)
- Fasteners & connections (57)
- Fences (1)
- Fire exit doors (1)
- Fire protection (2)
- Foundations (6)
- Insulation (6)
- Light gauge steel framing (1)
- Lintels (2)
- Parapets (6)
- PV panels (1)
- Roofs (37)
- Sandwich panels (1)
- Shear walls (1)
- Signs (3)
- Slabs (14)
- Tendons (1)
- Trusses (2)
- Wall head restraints (1)
- Walls (27)
- Wall ties (4)
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (3)
- CROSS-UK Newsletter 10 (6)
- CROSS-UK Newsletter 12 (5)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (3)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (5)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (5)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (4)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (115)
- CROSS Newsletter (60)
- CROSS Safety Alert (1)
- CROSS Safety Report (190)
- CROSS Theme Page (1)
- CROSS Topic Paper (2)
- News [sub-heading only] (15)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
- Third party content (3)
- Third party content (3)
CROSS regions
Collapse of folded plate timber roof at a school
This report is about a critical safety issue concerning folded timber roofs, in various settings, including over school halls.
18 October 2023
CROSS Safety Report
Report ID: 1160
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
Corrosion concerns on a pedestrian bridge
A reporter is concerned about a pedestrian bridge that may have reduced load capacity due to corrosion at the root of cantilever supports.
17 February 2023
CROSS Safety Report
Report ID: 1161
Region: CROSS-UK
Frustration about getting a response to a public safety concern
A member of the public reported a partially collapsed retaining structure to bodies they believed could be the responsible authority. Despite continued efforts to get attention to the issue, there was no apparent action to address the concern. This raised the reporter’s concern for public safety.
20 February 2023
CROSS Safety Report
Report ID: 1154
Region: CROSS-UK
RAAC planks in a 1970s shopping centre
An existing large shopping centre built circa 1975 had a number of external storerooms and loading bays with roofs constructed using reinforced autoclaved aerated concrete (RAAC) planks. The planks had deflected to the extent that they needed replacing.
20 February 2023
CROSS Safety Report
Report ID: 1155
Region: CROSS-UK
Accelerated corrosion of telecoms mast holding down bolts
During an examination of a 20m high telecoms mast, a reporter found that there had been accelerated corrosion of the galvanised holding down bolts.
1 June 2022
CROSS Safety Report
Report ID: 773
Region: CROSS-UK
Risks associated with historic stone balconies
A reporter highlights the structural issues of a stone balcony they encountered when working on a Grade II listed terrace house.
13 December 2021
CROSS Safety Report
Report ID: 1001
Region: CROSS-UK
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
Glass removal from façades
Removal of a glass panel from a building façade left a reporter concerned for the safety of both operatives and the public.
6 June 2022
CROSS Safety Report
Report ID: 988
Region: CROSS-UK
Overloading a portal frame with suspended services
A reporter designing a single storey portal frame used a standard roof service loading of 0.25kN/m2. After the project was completed, a tenant for the unit took over fit out and added a considerable amount of sprinkler pipework into the roof. This created local overloading.
21 August 2023
CROSS Safety Report
Report ID: 1195
Region: CROSS-UK