Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Theme pages
Locations
Content type
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK [sub-heading only] (7)
- CROSS Newsletter (6)
- CROSS Safety Report (12)
- News [sub-heading only] (1)
CROSS regions
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Fire evacuation concerns from large panel system tower blocks
A reporter highlights concerns about how alterations to a large panel system (LPS) roof may affect any evacuations from the rooftop by helicopter rescues.
1 April 2010
CROSS Safety Report
Report ID: 160
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Balcony construction defects of residential flats
A reporter's firm have been undertaking structural assessments of cantilevered reinforced concrete walkways, which in the majority of cases have been found to be under strength.
1 April 2014
CROSS Safety Report
Report ID: 435
Region: CROSS-UK
Balcony collapse at block of flats
An in-situ reinforced concrete balcony collapsed at a block of flats which are believed to have been built in the 1960s.
1 January 2014
CROSS Safety Report
Report ID: 341
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Unsafe removal of internal walls
A reporter was requested to advise on the removal of some internal walls in a decades’ old multi storey block of council flats after they were removed.
1 October 2018
CROSS Safety Report
Report ID: 714
Region: CROSS-UK
Poor quality of construction and lack of supervision on a block of flats
Concerns are raised over poor quality construction and a lack of supervision on a residential block of flats.
1 July 2017
CROSS Safety Report
Report ID: 672
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798
Region: CROSS-UK
Disproportionate collapse assessment of large panel system buildings
A reporter has become concerned by the approach being taken by some engineers to assess the risk of disproportionate collapse due to fire in large panel system (LPS) buildings.
1 January 2020
CROSS Safety Report
Report ID: 885
Region: CROSS-UK