Safety information search results
Filter your results
Building or structure type
- Bridges (15)
- Buildings
(120)
- Car parks (2)
- Commercial (6)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (4)
- Health care (1)
- Industrial buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (1)
- Residential (38)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (3)
- Theatres & other entertainment buildings (5)
- Transport buildings (1)
- Buried pipes & culverts (2)
- Masts & towers (9)
- Railways (3)
- Retaining structures (9)
- Roads (4)
- Sewers (1)
- Temporary structures (13)
Materials
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (12)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (90)
- Demolition project (4)
- Excavation (5)
- Extension project (3)
- Groundworks project (1)
- New build (49)
- Refurbishment (6)
- Remediation project (3)
- Strengthening project (2)
- Structural assessment (1)
- Underpinning project (3)
Method of construction
Elements & systems
- Arch (1)
- Balconies (5)
- Balustrades (4)
- Basements (4)
- Beams (29)
- Bracing (6)
- Cables (1)
- Ceilings (8)
- Cladding (9)
- Columns (14)
- Fasteners & connections (61)
- Fire protection (3)
- Foundations (22)
- Insulation (1)
- Light gauge steel framing (3)
- Lintels (2)
- Padstones (3)
- Parapets (3)
- Roofs (12)
- Shear walls (2)
- Signs (2)
- Slabs (10)
- Trusses (4)
- Wall head restraints (3)
- Walls (38)
- Wall ties (6)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 2 (2)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (6)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (3)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 18 (3)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (4)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (133)
- CROSS-US Newsletter 2 (4)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (4)
- CROSS Newsletter (73)
- CROSS Safety Alert (1)
- CROSS Safety Report (202)
- News [sub-heading only] (18)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Temporary bridge jacking
Transport for London (London Rail) reported publically on an incident concerning temporary bridge jacking and permission to reproduce an extract is gratefully acknowledged by CROSS.
1 April 2009
CROSS Safety Report
Report ID: 142
Region: CROSS-UK
Temporary works propping
A reporter raises concerns about the adequacy of temporary works that were installed on site during the refurbishing of a large office building.
1 January 2010
CROSS Safety Report
Report ID: 146
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Concerns on stability require prompt action
A reporter was concerned about overall building stability during an extension and conversion project.
1 January 2010
CROSS Safety Report
Report ID: 171
Region: CROSS-UK
Substitution of cold rolled hollow sections for hot rolled hollow sections
A reporter was advised by two of their manufacturers that their buyers have purchased cold formed hollow sections rather than the hot formed hollow section which we clearly identified in our calculations.
1 October 2009
CROSS Safety Report
Report ID: 158
Region: CROSS-UK
Decorative lights and banners can damage buildings
A reporter raises concerns about large banners and decorative lights that are often put up and attached to buildings without any thought given to the engineering considerations.
1 October 2009
CROSS Safety Report
Report ID: 159
Region: CROSS-UK
Piling platform failure
While back screwing an auger, the ground began to fail under the foot of the rig causing it to sink forwards and collapse.
1 January 2012
CROSS Safety Report
Report ID: 271
Region: CROSS-UK
Failure of epoxy fixings due to high temperature
Two mobile phone towers erected on the roofs of nearby buildings collapsed when the epoxy anchors pulled out of the drilled holes.
1 October 2011
CROSS Safety Report
Report ID: 244
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Concern about faulty self-certification of new installation
A reporter’s client had work done in a domestic property by a specialist contractor who was registered under a self-certification Competent Person’s Scheme (CPS) but the work was faulty.
1 April 2012
CROSS Safety Report
Report ID: 263
Region: CROSS-UK