Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
CROSS regions
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Problem when launching a prestressed beam
When lowered onto its elastomeric bearings, a 40m span post-tensioned ‘I’ beam started to move towards the outer edge of the pier cap.
30 July 2021
CROSS Safety Report
Report ID: 1027
Region: CROSS-UK
Propping of post-tensioned slabs during construction
A reporter raises their concerns after an infill slab strip was not poured in time which resulted in overloading of the slab below during a concrete pour.
1 April 2020
CROSS Safety Report
Report ID: 873
Region: CROSS-UK
Post-tensioned slab failure during tendon stressing operations
A reporter disseminates the lessons learned after the end of a slab burst while stressing the tendons in a post-tensioned concrete slab.
1 April 2020
CROSS Safety Report
Report ID: 882
Region: CROSS-UK
Inspection and maintenance of Super-T bridge girders
Doubts exist about the durability and maintenance of bridge Super-T girders as a result of lack of access for inspection of sealed internal cavities.
1 August 2020
CROSS Safety Report
Report ID: 956
Region: CROSS-AUS
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.