Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK [sub-heading only] (9)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (7)
- CROSS Safety Report (24)
- News [sub-heading only] (1)
CROSS regions
Risk of failure of untested vibration isolators with seismic restraint
Risk of failure of vibration isolators with integral seismic restraint being used without independent third party testing
7 November 2023
CROSS Safety Report
Report ID: 1230
Region: CROSS-AUS
Fire resisting doors fixed open in hot weather
When visiting a client during a period of unusually hot weather, it was noted that the vast majority of the building’s fire resisting door sets were wedged open in an attempt to increase ventilation and reduce internal temperatures.
21 August 2023
CROSS Safety Report
Report ID: 1162
Region: CROSS-UK
Fire protection to car park steel frame
A reporter is concerned about the fire protection of a steel framed car park above a retail unit.
26 August 2022
CROSS Safety Report
Report ID: 1007
Region: CROSS-UK
Change of use to care home
A report has been received relating to the intended change of use of a large building.
6 June 2022
CROSS Safety Report
Report ID: 1078
Region: CROSS-UK
Fire involving fluorescent light fitting
A fire involving a fluorescent light fitting occurred in a corridor in a sheltered housing complex.
21 August 2023
CROSS Safety Report
Report ID: 1157
Region: CROSS-UK
Inadequate design and procurement of large steel roof structure
This report demonstrates the importance of following the correct process for project procurement, including preparing a detailed design and project specification, and certificating compliance with the relevant building codes. It also covers the potential consequences when shortcuts are taken.
30 March 2023
CROSS Safety Report
Report ID: 1123
Region: CROSS-AUS
No structural design for steel portal frame building
A reporter is concerned that, in some cases, no structural design is carried out for steel portal framed buildings.
1 January 2020
CROSS Safety Report
Report ID: 866
Region: CROSS-UK
Nuts falling from tension glazing system
A reporter raises concerns about the fixings used in a tension glazing system.
1 July 2013
CROSS Safety Report
Report ID: 340
Region: CROSS-UK
Dangerously defective glass smoke screens
A reporter was asked to investigate the spontaneous failure of glass smoke control screens at a major retail store.
1 July 2018
CROSS Safety Report
Report ID: 734
Region: CROSS-UK
Design criteria for firefighting lifts
A reporter is of the opinion that the design criteria for firefighting lifts should be re-evaluated.
24 May 2023
CROSS Safety Report
Report ID: 1182
Region: CROSS-UK