Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
- Alteration & conversion project (5)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (17)
- Demolition project (1)
- Excavation (1)
- Extension project (3)
- Groundworks project (1)
- New build (5)
- Refurbishment (3)
- Remediation project (1)
- Repair project (2)
- Structural assessment (1)
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (16)
- CROSS Newsletter (11)
- CROSS Safety Report (25)
- CROSS Topic Paper (1)
- News [sub-heading only] (4)
CROSS regions
Long term risks for ground anchors
A reporter is concerned about the inspection and maintenance of ground anchors that are used for strategic flood defences.
1 October 2007
CROSS Safety Report
Report ID: 87
Region: CROSS-UK
Embankment slip during excavation works
Concerns were raised and strengthening works required after vertical movement was observed on the safety critical surface at the top of an 8m high embankment.
1 October 2016
CROSS Safety Report
Report ID: 572
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Undermined bridge wing wall collapses
A masonry wing wall of a bridge collapsed and fell as a single section coming to rest against an adjacent pile after being undermined on site.
1 April 2016
CROSS Safety Report
Report ID: 577
Region: CROSS-UK
Temporary works design for basements
A reporter had an inquiry from a contractor who, after appointment, discovered that there was a serious lack of temporary works design information provided.
1 July 2015
CROSS Safety Report
Report ID: 423
Region: CROSS-UK
Post-tensioned slab failure during tendon stressing operations
A reporter disseminates the lessons learned after the end of a slab burst while stressing the tendons in a post-tensioned concrete slab.
1 April 2020
CROSS Safety Report
Report ID: 882
Region: CROSS-UK
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK
Stability of existing structures impacting construction sites
A reporter discusses the clients and principal contractors duties regarding the stability of existing structures on site, particularly those scheduled for demolition.
1 January 2018
CROSS Safety Report
Report ID: 693
Region: CROSS-UK
Unsafe design of retrofit cantilever balconies
A structural assessment of a number of new balconies being added to an existing building revealed critical concerns in respect of fixings back into the existing brickwork.
26 August 2022
CROSS Safety Report
Report ID: 1128
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.