Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (10)
- CROSS Newsletter (6)
- CROSS Safety Report (25)
- News [sub-heading only] (3)
CROSS regions
Structures at risk from scour and erosion
Following some recent structural failures, a reporter is concerned that asset owners may not fully realise risks associated with scour and erosion.
1 January 2020
CROSS Safety Report
Report ID: 617
Region: CROSS-UK
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Unsafe excavation practices
A builder undermined the existing footing of a masonry wall without being aware of the risks.
30 July 2021
CROSS Safety Report
Report ID: 1026
Region: CROSS-UK
Object rolling into live carriageway
A disc of concrete rolled from a construction area onto a live carriageway, colliding with a passing vehicle.
6 June 2022
Report ID: 1089
Region: CROSS-UK
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Unsafe instructions from a building inspector
On the site for an extension to a domestic property, a building inspector instructed a contractor to excavate a deep trench. The trench was in front of the neighbour's adjacent boundary retaining wall, and left a deep vertical face under the house being extended.
10 March 2022
CROSS Safety Report
Report ID: 1086
Region: CROSS-UK
Concern about foundations to telecoms masts
Concerns are raised about a potential safety problem with the design and construction of ‘root’ foundations for telecom poles.
1 January 2018
CROSS Safety Report
Report ID: 690
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Sudden hole in piling mat - update
This is further information about report 566 which highlighted how a sudden hole appeared in a piling mat.
1 October 2016
CROSS Safety Report
Report ID: 596
Region: CROSS-UK
Submit a report