Safety information search results
Filter your results
Materials
Products
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Elements & systems
- Arch (1)
- Balconies (1)
- Balustrades (4)
- Basements (2)
- Beams (7)
- Bracing (2)
- Canopies (1)
- Ceilings (2)
- Cladding (10)
- Columns (5)
- Fasteners & connections (22)
- Fences (1)
- Fire exit doors (1)
- Fire protection (1)
- Foundations (4)
- Light gauge steel framing (3)
- Lintels (1)
- Padstones (1)
- Parapets (2)
- PV panels (1)
- Roofs (13)
- Shear walls (1)
- Slabs (6)
- Trusses (1)
- Walls (11)
- Wall ties (2)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 5 (4)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (7)
- CROSS-UK Newsletter 64 (3)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-US Newsletter 3 (5)
- CROSS Newsletter (8)
- CROSS Review (13)
- CROSS Safety Report (102)
- CROSS Theme Page (1)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (2)
- Third party article (1)
- Third party content (3)
- Third party content (1)
- Third party report (1)
CROSS regions
Retaining wall collapses onto rail track
A retaining wall failed and collapsed onto a railway track.
1 June 2022
CROSS Safety Report
Report ID: 775
Region: CROSS-UK
Failure of vertical bracing system in coffee shop
A reporter noticed that a bolt at a low level connecting node of the vertical bracing system in a public building had failed.
30 June 2022
CROSS Safety Report
Report ID: 759
Region: CROSS-UK
Dangerous defects in curtain wall glazing
This report concerns a 5m high vertical glazing system in which the fixings for a panel failed after only four years because of a lack of co-ordination between designers and contractors.
6 April 2023
CROSS Safety Report
Report ID: 762
Region: CROSS-UK
Corrosion of bridge girder beams
Severe corrosion of bridge girder beams was found during intrusive inspections.
23 May 2022
CROSS Safety Report
Report ID: 772
Region: CROSS-UK
Accelerated corrosion of telecoms mast holding down bolts
During an examination of a 20m high telecoms mast, a reporter found that there had been accelerated corrosion of the galvanised holding down bolts.
1 June 2022
CROSS Safety Report
Report ID: 773
Region: CROSS-UK
Failure of prestressed hollowcore units during storage and transport
A reporter shares their experience of the failure of prestressed hollowcore units during storage and transport.
1 June 2022
CROSS Safety Report
Report ID: 748
Region: CROSS-UK
Retaining wall collapsed onto highway due to heavy rain
A 2.5m high sandstone retaining wall collapsed onto a highway following a period of heavy rain.
1 June 2022
CROSS Safety Report
Report ID: 791
Region: CROSS-UK
Slipform temporary works design
A reporter was performing a CAT III check on a 14 storey slipform design when they discovered that the temporary works design was inadequate.
5 September 2022
CROSS Safety Report
Report ID: 809
Region: CROSS-UK
Has the role of building control changed?
A reporter raises a query about the role of Building Control.
5 September 2022
CROSS Safety Report
Report ID: 810
Region: CROSS-UK
Galvanic (bimetallic) corrosion not considered in cladding design
A cladding designer and installer did not consider galvanic (bimetallic) corrosion which led to remedial works being required.
30 June 2022
CROSS Safety Report
Report ID: 811