Safety information search results
Filter your results
Building or structure type
- Bridges (4)
- Buildings
(46)
- Agricultural buildings (4)
- Car parks (1)
- Commercial (5)
- Education, science & art buildings (2)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (2)
- Laboratory buildings (1)
- LPS buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (2)
- Recreational buildings (1)
- Residential (13)
- Stadiums (1)
- Storage buildings (5)
- Tall buildings (3)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Masts & towers (3)
- Railways (1)
- Temporary structures (2)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
Method of construction
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 23 (3)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (16)
- CROSS-US Newsletter 2 (2)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (12)
- CROSS Safety Alert (1)
- CROSS Safety Report (50)
- News [sub-heading only] (4)
CROSS regions
Inappropriate material storage causes collapse of ceiling of a truck dock mezzanine
This report describes the collapse of an overloaded framed ceiling.
10 May 2021
CROSS Safety Report
Report ID: 983
Region: CROSS-US
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Vertical cross bracing unbolted on-site
A reporter came across a situation where a vertical cross bracing member of a temporary steel frame structure had been unbolted on-site.
10 February 2023
CROSS Safety Report
Report ID: 861
Region: CROSS-UK
Temporary instability of columns
Concerns were raised by a reporter on the temporary stability of concrete columns during construction.
2 February 2023
CROSS Safety Report
Report ID: 872
Region: CROSS-UK
Collapse of external brick wall during demolition works
A section of an external brick wall of a building collapsed suddenly and unexpectedly part way through a demolition contract.
13 December 2022
CROSS Safety Report
Report ID: 875
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
Channel slab roof deck collapse during reroofing
This report highlights the structural risk caused by machinery during reroof a project.
10 May 2021
CROSS Safety Report
Report ID: 970
Region: CROSS-US
Structural misunderstanding leads to historic church tower nearly being demolished
A historic church stands at the center of a charming town. Highlighted among many striking features is the iconic 170-foot (52m) bell tower, which looms over the town. For decades, the tower has become the centerpiece for cultural events in addition to being the original community center of worship.
2 May 2023
CROSS Safety Report
Report ID: 1013
Region: CROSS-US