Safety information search results
Filter your results
Building or structure type
- (-)
Buildings
(49)
- Agricultural buildings (3)
- Commercial (6)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (7)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (3)
- LPS buildings (2)
- Public, religious & civic buildings (2)
- Recreational buildings (1)
- Residential (9)
- Storage buildings (2)
- Tall buildings (5)
- Car parks (3)
- Flats & apartments (3)
- Houses (2)
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Elements & systems
- Balconies (2)
- Balustrades (1)
- Basements (1)
- Beams (4)
- Bracing (1)
- Canopies (3)
- Ceilings (4)
- Cladding (3)
- Columns (3)
- Fasteners & connections (19)
- Foundations (2)
- Insulation (1)
- Light gauge steel framing (1)
- Roofs (14)
- Sandwich panels (1)
- Shear walls (1)
- Slabs (4)
- Trusses (2)
- Wall head restraints (1)
- Walls (9)
- Wall ties (3)
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 23 (4)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (26)
- CROSS Newsletter (8)
- CROSS Safety Alert (1)
- CROSS Safety Report (47)
- CROSS Topic Paper (1)
- News [sub-heading only] (2)
CROSS regions
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
RAAC assessment undertaken by persons not suitably experienced
A reinforced aerated autoclaved concrete (RAAC) assessment was carried out by persons who did not appear to have appropriate experience, potentially putting building users at risk of harm.
21 August 2023
CROSS Safety Report
Report ID: 1224
Region: CROSS-UK
Risk of failure of untested vibration isolators with seismic restraint
Risk of failure of vibration isolators with integral seismic restraint being used without independent third party testing
7 November 2023
CROSS Safety Report
Report ID: 1230
Region: CROSS-AUS
Hazard identification for structural design
At the outset of the design, it is recommended that the structural engineer should document the proposed structural design philosophy and the approach to design against disproportionate collapse and agree this with the client.
1 September 2017
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Concerns over robustness of some 20 year old buildings
Concerns about the robustness of several two-storey buildings dating from the early 2000s.
6 June 2022
CROSS Safety Report
Report ID: 1051
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Timber truss
The reporter has been dealing with an application where the engineer involved discovered proprietary timber girder trusses with some glued joints that have come loose.
1 February 2007
CROSS Safety Report
Report ID: 62
Region: CROSS-UK
Elliot Lake mall collapse
In June 2012 part of the roof of a thirty two year old Mall in Ontario, Canada collapsed killing two people and injuring nineteen.
1 December 2014
CROSS Topic Paper
Region: CROSS-UK