Safety information search results
Filter your results
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (4)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (11)
- Extension project (3)
- Fire safety assessment (1)
- Maintenance project (1)
- New build (5)
- Refurbishment (2)
- Remediation project (1)
- Repair project (1)
- Structural assessment (1)
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK [sub-heading only] (12)
- CROSS Newsletter (7)
- (-) CROSS Safety Report (20)
- News [sub-heading only] (7)
CROSS regions
Concerns over execution class categorisation of steel pedestrian bridge
A reporter is concerned in respect of the steelwork execution class, and quality management arrangements, applied to the construction of a public access pedestrian bridge.
21 November 2022
CROSS Safety Report
Report ID: 1149
Region: CROSS-UK
Incompetent design of simple steel beams
This report concerns designs for simple steel beams submitted to building control bodies under Part A of the Building Regulations. The reporter, a checking engineer for a building control body, was not able to accept the effective length and restraints assumed in a number of submitted designs. Most originated from individuals who used proprietary structural design computer packages without, i...
24 May 2023
CROSS Safety Report
Report ID: 1183
Region: CROSS-UK
Apparently simple home improvement work leads to dangerous situation
Apparently simple home improvement work, consisting of reroofing and a loft conversion, resulted in a 'near miss' with potentially dangerous conditions for neighbours.
21 August 2023
CROSS Safety Report
Report ID: 1173
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Building regulations submissions
This report has been written on behalf of a group of senior local government structural engineers who refer to previous CROSS newsletters and in particular the reports relating to the poor quality of building regulation submissions and lack of checking resources.
1 July 2007
CROSS Safety Report
Report ID: 65
Region: CROSS-UK
Loading on balconies
A reporter wrote on behalf of a professional committee to draw attention to a concern about part of a conversion project that had come to their attention.
1 July 2007
CROSS Safety Report
Report ID: 52
Region: CROSS-UK
Proper design and use of cold rolled steel frames
A reporter has been designing structures in cold rolled steel for approximately twenty years, mainly portal frame buildings, and some concerns.
1 January 2008
CROSS Safety Report
Report ID: 93
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.