Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (19)
- Demolition project (1)
- Excavation (1)
- Extension project (3)
- Groundworks project (1)
- New build (6)
- Refurbishment (4)
- Remediation project (1)
- Repair project (2)
- Structural assessment (2)
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (19)
- CROSS Newsletter (15)
- (-) CROSS Safety Report (32)
- News [sub-heading only] (4)
CROSS regions
Issues for CDM co-ordinators
A reporter feels that a lack of finance is being invested in the long-term maintenance for structures and that this is a difficult issue for the CDM co-ordinator to raise with the client.
1 January 2009
CROSS Safety Report
Report ID: 118
Region: CROSS-UK
Deterioration of walkable sandwich panel ceilings
A reporter has raised concern about a complex and potentially far-reaching concern about unseen progressive deterioration in sandwich ceiling panels that have mineral wool lamella cores.
1 October 2007
CROSS Safety Report
Report ID: 54
Region: CROSS-UK
Long term risks for ground anchors
A reporter is concerned about the inspection and maintenance of ground anchors that are used for strategic flood defences.
1 October 2007
CROSS Safety Report
Report ID: 87
Region: CROSS-UK
Advice wanted by amateur builder
This notice, seen by a reporter, was posted on a DIY website, and whilst it may be apocryphal, it illustrates the type of queries received by local authorities and building regulations officers.
1 January 2009
CROSS Safety Report
Report ID: 125
Region: CROSS-UK
Bridge component failures
A reporter raises their concerns that not enough thought is being given to structural redundancy and buildability for bridges.
1 July 2009
CROSS Safety Report
Report ID: 141
Region: CROSS-UK
Temporary works design for basements
A reporter had an inquiry from a contractor who, after appointment, discovered that there was a serious lack of temporary works design information provided.
1 July 2015
CROSS Safety Report
Report ID: 423
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Undermined bridge wing wall collapses
A masonry wing wall of a bridge collapsed and fell as a single section coming to rest against an adjacent pile after being undermined on site.
1 April 2016
CROSS Safety Report
Report ID: 577
Region: CROSS-UK
Responsibilities for hybrid concrete construction
Concerns are raised after a substantial precast element, weighing over 10t, had been placed in position and used as part of the shuttering for an in-situ pour without it being designed to act as a shutter.
1 October 2016
CROSS Safety Report
Report ID: 574
Region: CROSS-UK
Ensuring CDM safety files are transferred after change of ownership
Concerns are raised that there is no effective system in place to ensure CDM safety files are passed on to new owners when properties change hands.
1 January 2017
CROSS Safety Report
Report ID: 581
Region: CROSS-UK