Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
- BIM (1)
- Computational design (4)
- Design: quality management (7)
- Design calculations (13)
- Design conceptualisation (8)
- Design detailing (12)
- Design drawings (3)
- Design loads (6)
- Design software (6)
- Dynamics (1)
- Fire safety design (3)
- Resilience (4)
- Robustness (9)
- Structural design (13)
- Sustainability (2)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (8)
- Assessment project [sub-heading only] (6)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (30)
- Excavation (1)
- Extension project (6)
- Fire safety assessment (1)
- New build (5)
- Refurbishment (5)
- Remediation project (6)
- Repair project (4)
- Structural assessment (7)
Method of construction
Elements & systems
- Arch (1)
- Balustrades (1)
- Basements (1)
- Beams (11)
- Bracing (2)
- Cables (1)
- Cladding (2)
- Columns (6)
- Fasteners & connections (9)
- Fire protection (3)
- Foundations (4)
- Insulation (1)
- Light gauge steel framing (1)
- Padstones (1)
- Parapets (1)
- Roofs (5)
- Shear walls (1)
- Signs (1)
- Slabs (5)
- Tendons (1)
- Trusses (2)
- Walls (13)
- Wall ties (2)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (27)
- CROSS Newsletter (11)
- (-) CROSS Safety Report (53)
- News [sub-heading only] (6)
CROSS regions
Building control and budget limitations
A reporter is concerned that many local authorities do not seem to have the knowledge or impetus to address some technical issues even if the legislation is there for them as a course of action.
1 January 2015
CROSS Safety Report
Report ID: 389
Region: CROSS-UK
Responsibilities of local authorities for possibly dangerous structures
A reporter, who used to be involved with building control, believes that local authorities have a duty to decide if a danger exists when a member of the public draws their attention to a potentially dangerous situation.
1 January 2014
CROSS Safety Report
Report ID: 348
Region: CROSS-UK
Collapse of domestic glass balustrade due to inadequate fixings
A firm was asked to provide professional advice regarding the replacement of a glass balustrade which had collapsed.
1 July 2018
CROSS Safety Report
Report ID: 756
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798
Region: CROSS-UK
Inadequate structural design on industrial steel structures
A reporter's firm believes that steel structures associated with plant are being erected without a design being carried out by a structural engineer and are therefore potentially dangerous.
1 April 2019
CROSS Safety Report
Report ID: 804
Region: CROSS-UK
Unauthorised structural alterations to accommodate drainpipes
A reporter became aware of cases where main structural steel sections were ‘butchered’ on site to accommodate drainpipes.
1 July 2020
CROSS Safety Report
Report ID: 902
Region: CROSS-UK
Structural issues with cladding
A reporter who investigates cladding failures shares common issues they have encountered.
1 April 2020
CROSS Safety Report
Report ID: 904
Region: CROSS-UK
Consequences of low professional fees
An engineer believes that despite public concerns about workmanship issues on site, low professional fees mean that engineers are not able to adequately check the work on site.
1 July 2020
CROSS Safety Report
Report ID: 905
Region: CROSS-UK
No structural design for steel portal frame building
A reporter is concerned that, in some cases, no structural design is carried out for steel portal framed buildings.
1 January 2020
CROSS Safety Report
Report ID: 866
Region: CROSS-UK
Fire resistance of multi-storey car parks
A reporter visited a recently constructed car park which contained some of the same design issues discussed in the February 2018 Standing Committee on Structural Safety (SCOSS) Alert on Fire in Multi-Storey Car Parks.
1 October 2019
CROSS Safety Report
Report ID: 857
Region: CROSS-UK