Safety information search results
Filter your results
Building or structure type
- Bridges (30)
- Buildings
(182)
- Agricultural buildings (2)
- Commercial (11)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (4)
- Health care (1)
- Higher-risk buildings (2)
- Industrial buildings (7)
- LPS buildings (2)
- Public, religious & civic buildings (5)
- Recreational buildings (3)
- Residential (61)
- Stadiums (2)
- Storage buildings (3)
- Tall buildings (7)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Buried pipes & culverts (3)
- Car parks (4)
- Flats & apartments (16)
- Floating structures (1)
- Hotels & hostels (1)
- Houses (26)
- Marine structures (1)
- Masts & towers (8)
- Railways (7)
- Reservoirs & dams (1)
- Retaining structures (14)
- Roads (5)
- Sewers (4)
- Temporary structures (12)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (41)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (2)
- (-) Construction project [sub-heading only] (262)
- Demolition project (14)
- Excavation (16)
- Extension project (19)
- Groundworks project (2)
- Maintenance project (5)
- New build (104)
- Refurbishment (17)
- Remediation project (22)
- Repair project (9)
- Strengthening project (9)
- Structural assessment (7)
- Underpinning project (4)
Method of construction
Elements & systems
- Arch (4)
- Balconies (8)
- Balustrades (9)
- Basements (9)
- Beams (45)
- Bracing (13)
- Canopies (1)
- Ceilings (2)
- Cladding (13)
- Columns (30)
- Fasteners & connections (57)
- Fire protection (4)
- Foundations (30)
- Insulation (4)
- Light gauge steel framing (5)
- Lintels (3)
- Padstones (4)
- Parapets (4)
- PV panels (1)
- Roofs (17)
- Sandwich panels (1)
- Shear walls (5)
- Signs (1)
- Slabs (30)
- Tendons (1)
- Trusses (4)
- Wall head restraints (2)
- Walls (53)
- Wall ties (5)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (2)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (4)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS [sub-heading only] (9)
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (4)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (3)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 34 (4)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (5)
- CROSS-UK Newsletter 41 (3)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (5)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (5)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (5)
- CROSS-UK Newsletter 68 (4)
- CROSS-UK [sub-heading only] (154)
- CROSS-US Newsletter 1 (3)
- CROSS-US Newsletter 2 (5)
- CROSS-US [sub-heading only] (7)
- CROSS Newsletter (100)
- (-) CROSS Safety Report (262)
- News [sub-heading only] (34)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Concerns over corrosion of dissimilar metals in fixing cavity wall tie systems
A reporter is concerned about corrosion that may occur between dissimilar metals that can be used in cavity wall tie systems. The reporter has noted that stainless steel and carbon steel may be fixed together in wall cavities, which are damp environments, and that corrosion of dissimilar metals in contact may occur.
24 May 2023
CROSS Safety Report
Report ID: 1186
Region: CROSS-UK
Apparently simple home improvement work leads to dangerous situation
Apparently simple home improvement work, consisting of reroofing and a loft conversion, resulted in a 'near miss' with potentially dangerous conditions for neighbours.
21 August 2023
CROSS Safety Report
Report ID: 1173
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Concern about rebending starter bars
This report concerns the bending and rebending of starter bars on site during the construction of a multi storey tower. The reporter considered that such a practice could compromise the structure under extreme load conditions.
24 May 2023
CROSS Safety Report
Report ID: 1164
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
Cladding subcontractor change of connection strategy led to failure
As part of their final design submission, a cladding subcontractor changed the connection strategy for their cladding system. The project structural engineer did not identify the design change and the cladding loading resulted in excessive deflection and some twisting of the primary perimeter steel.
21 August 2023
CROSS Safety Report
Report ID: 1189
Region: CROSS-UK
Failure to grout steel frame bases
A reporter describes a problem that arose during the construction stage of a project when a steel frame supporting pipe and cable racks was loaded before the frame baseplates were grouted.
24 May 2023
CROSS Safety Report
Report ID: 1190
Region: CROSS-UK
Design of internal partitions for horizontal loads
This report draws attention to the requirement for internal partitions to be designed for horizontal loads from wind and seismic effects in accordance with Section B of the Australian National Construction Code (NCC).
30 April 2021
CROSS Safety Report
Report ID: 1000
Region: CROSS-AUS
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
Concern over concrete test methods used on site
A reporter is concerned about the test method a contractor uses to justify the strength of concrete placed on site.
13 December 2022
CROSS Safety Report
Report ID: 840
Region: CROSS-UK