Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (10)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (30)
- Demolition project (1)
- Excavation (2)
- Extension project (5)
- Maintenance project (1)
- New build (9)
- Refurbishment (3)
- Remediation project (3)
- Repair project (3)
- Structural assessment (1)
Method of construction
Structural form
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (33)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (12)
- CROSS Safety Alert (1)
- CROSS Safety Report (55)
- News [sub-heading only] (8)
CROSS regions
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
Contractor uses incorrect fixing bolts for masonry support angles
A correspondent noticed that proprietary masonry support angles specified to support the outer leaf of masonry had been incorrectly connected to the steel beam using carriage bolts.
1 July 2019
CROSS Safety Report
Report ID: 794
Region: CROSS-UK
Repeating the same design mistakes
A correspondent who investigates engineering failures has shared common errors which engineers keep repeating.
1 October 2019
CROSS Safety Report
Report ID: 858
Region: CROSS-UK
Stability of brick walls
A 230mm cantilevered brick wall approximately 1.6m high failed after backfill material was placed behind it, which was not the design intent.
1 April 2015
CROSS Safety Report
Report ID: 475
Region: CROSS-UK
Cantilevered brickwork - fatal collapse during construction
A blade of 270mm cavity brickwork in a temporary condition fell and killed a bricklayer after sixteen scaffold planks were leant against the wall on the side remote from the bricklayer.
1 April 2015
CROSS Safety Report
Report ID: 476
Region: CROSS-UK
Blockwork lateral restraint
A recent building control inspection revealed issues with basement blockwork walls restrained by wind posts.
1 January 2015
CROSS Safety Report
Report ID: 414
Region: CROSS-UK
Structural issues with cladding
A reporter who investigates cladding failures shares common issues they have encountered.
1 April 2020
CROSS Safety Report
Report ID: 904
Region: CROSS-UK
Rigid wall flexible diaphragm roof collapse in earthquake
Part of the roof of a one-story building in California collapsed during a 2019 earthquake.
1 March 2020
CROSS Safety Report
Report ID: 877
Region: CROSS-US
Unrestrained stone cladding falls from building
A person was injured when a large piece of stone cladding fell from a leisure complex that was completed in the early 2000’s.
1 April 2017
CROSS Safety Report
Report ID: 619
Region: CROSS-UK
Incomplete casting of composite brick/concrete parapets
A reporter states that during a parapet raising scheme over a mainline railway, a void up to 300mm deep was identified below existing coping bed level.
1 January 2018
CROSS Safety Report
Report ID: 635
Region: CROSS-UK