Safety information search results
Filter your results
Building or structure type
- Bridges (18)
- Buildings
(111)
- Agricultural buildings (1)
- Car parks (4)
- Commercial (12)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (5)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Public, religious & civic buildings (2)
- Recreational buildings (3)
- Residential (26)
- Storage buildings (1)
- Tall buildings (6)
- Theatres & other entertainment buildings (4)
- Transport buildings (1)
- Buried pipes & culverts (1)
- Masts & towers (3)
- Railways (2)
- Reservoirs & dams (1)
- Retaining structures (9)
- Roads (3)
- Sewers (2)
- Temporary structures (9)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (2)
- Design: quality management (23)
- Design calculations (27)
- Design conceptualisation (11)
- Design detailing (56)
- Design drawings (21)
- Design loads (36)
- Design software (8)
- Dynamics (2)
- Fire safety design (8)
- Resilience (3)
- Robustness (16)
- Structural design (52)
- Sustainability (2)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (10)
- Assessment project [sub-heading only] (5)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (70)
- Demolition project (1)
- Excavation (4)
- Extension project (6)
- Groundworks project (1)
- Maintenance project (1)
- New build (37)
- Refurbishment (7)
- Remediation project (10)
- Repair project (5)
- Strengthening project (3)
- Structural assessment (7)
- Underpinning project (1)
Method of construction
Structural form
Elements & systems
- Arch (1)
- Balconies (2)
- Balustrades (7)
- Basements (3)
- Beams (28)
- Bracing (8)
- Ceilings (4)
- Cladding (17)
- Columns (13)
- Fasteners & connections (55)
- Fire protection (6)
- Foundations (9)
- Insulation (5)
- Light gauge steel framing (3)
- Padstones (2)
- Parapets (4)
- PV panels (1)
- Roofs (26)
- Sandwich panels (1)
- Signs (1)
- Slabs (17)
- Trusses (7)
- Walls (23)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (2)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (7)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (5)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (100)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (3)
- CROSS-US [sub-heading only] (4)
- CROSS Newsletter (62)
- CROSS Safety Alert (1)
- CROSS Safety Report (173)
- CROSS Topic Paper (1)
- News [sub-heading only] (26)
CROSS regions
Failure of existing long-span wood roof truss following installation of new roof-top HVAC units
Failure of an existing long-span wood roof truss following installation of new roof-top Heating, Ventilating, and Air Conditioning (HVAC) units offers lessons in the special challenges of renovations to existing buildings.
1 September 2020
CROSS Safety Report
Report ID: 949
Region: CROSS-US
Bottom-chord bracing for metal plate-connected wood trusses used in light-commercial applications
Concerns regarding metal plate-connected wood trusses in light-commercial construction when subject to net uplift.
1 September 2020
CROSS Safety Report
Report ID: 985
Region: CROSS-US
Crane outrigger loads underestimated due to misuse of software
A reporter is concerned about how the misuse of software can lead to incorrect outrigger loads being used in the design of foundations for crane outriggers.
1 April 2020
CROSS Safety Report
Report ID: 915
Region: CROSS-UK
Collapse of a reinforcing cage
The reinforcing cage to a blade pier for an overpass bridge collapsed without warning when nearing completion.
1 August 2020
CROSS Safety Report
Report ID: 941
Region: CROSS-AUS
Structural engineer faces ethical challenge
A structural engineer performing a delegated design faced an ethical dilemma when discovering what is believed to be errors in the base structural design performed by others.
1 September 2020
CROSS Safety Report
Report ID: 943
Region: CROSS-US