Safety information search results
Filter your results
Building or structure type
- Bridges (8)
- Buildings
(75)
- Car parks (2)
- Commercial (4)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (4)
- Health care (1)
- Higher-risk buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (2)
- Residential (20)
- Stadiums (1)
- Storage buildings (2)
- Tall buildings (4)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Masts & towers (4)
- Railways (2)
- Retaining structures (3)
- Roads (1)
- Sewers (1)
- Temporary structures (3)
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Elements & systems
- Balconies (4)
- Balustrades (3)
- Basements (1)
- Beams (24)
- Bracing (6)
- Canopies (1)
- Cladding (7)
- Columns (17)
- Fasteners & connections (27)
- Fire protection (4)
- Foundations (14)
- Insulation (2)
- Light gauge steel framing (3)
- Lintels (2)
- Padstones (2)
- Roofs (4)
- Signs (1)
- Slabs (19)
- Tendons (1)
- Trusses (1)
- Wall head restraints (1)
- Walls (17)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (5)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 58 (5)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (68)
- CROSS-US Newsletter 2 (1)
- CROSS-US Newsletter 3 (2)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (54)
- CROSS Safety Report (104)
- News [sub-heading only] (17)
CROSS regions
Lightweight steel roof partial collapse
A hall constructed from thin cold rolled steel sections riveted together started collapsing when tiles were loaded on one side only.
1 April 2014
CROSS Safety Report
Report ID: 383
Region: CROSS-UK
High strength concrete incident
Confusion on sites lead to the incorrect concrete grade being used for some structural elements.
1 April 2014
CROSS Safety Report
Report ID: 406
Region: CROSS-UK
Responsibilities for hybrid concrete construction
Concerns are raised after a substantial precast element, weighing over 10t, had been placed in position and used as part of the shuttering for an in-situ pour without it being designed to act as a shutter.
1 October 2016
CROSS Safety Report
Report ID: 574
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Lack of experience on steel column erection
A reporter highlights how works progressed on site without a detailed method statement being provided by the contractor even though it had been requested.
1 April 2013
CROSS Safety Report
Report ID: 324
Region: CROSS-UK
Missing rebar identified prior to concrete slab pour
A reporter describes how they often encounter issues such as missing reinforcement while carrying out pre-pour inspections.
1 January 2013
CROSS Safety Report
Report ID: 310
Region: CROSS-UK
Falsework collapse during slab pour in SE Asia
There was a partial collapse of falsework on a project in Southeast Asia.
1 July 2013
CROSS Safety Report
Report ID: 337
Region: CROSS-UK
Failure of precast concrete cover slab to circular shaft
A reporter describes how several precast concrete cover slab units collapsed shortly after being installed.
1 April 2015
CROSS Safety Report
Report ID: 505
Region: CROSS-UK