Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Design
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 5 (2)
- CROSS-UK Newsletter 61 (3)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-US Newsletter 3 (3)
- CROSS Newsletter (3)
- CROSS Safety Report (68)
- CROSS Theme Page (1)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (2)
- Third party content (2)
- Third party content (1)
- Third party report (1)
CROSS regions
Trench sheet naming confusion
A reporter involved with temporary works design has been made aware that there are two suppliers providing a trench sheet under the same name.
30 June 2022
CROSS Safety Report
Report ID: 814
Region: CROSS-UK
Checking structural calculations
A reporter worked for a small consultancy as a graduate structural engineer where their calculations were never checked.
3 August 2023
CROSS Safety Report
Report ID: 816
Region: CROSS-UK
Missing elements from 3D modelling
A reporter shares their experience on how their team consistently discover missing elements when they erect lattice towers and masts that have been 3D modelled.
5 September 2022
CROSS Safety Report
Report ID: 792
Region: CROSS-UK
Stress fracture on temporary compact stairs
A stress fracture to a temporary access compact stair unit was identified on site by a scaffold manager.
19 March 2023
CROSS Safety Report
Report ID: 805
Region: CROSS-UK
Questionable temporary works used to retain embankment excavation
This report is about the need for properly engineered retaining walls for all heights of retained materials.
1 June 2022
CROSS Safety Report
Report ID: 806
Region: CROSS-UK
Excessive surcharge at the back of a retaining wall
A reporter raises concerns about excessive surcharging at the top of a small retaining wall which was supporting the garden of the property.
2 February 2023
CROSS Safety Report
Report ID: 834
Region: CROSS-UK
Concern over concrete test methods used on site
A reporter is concerned about the test method a contractor uses to justify the strength of concrete placed on site.
13 December 2022
CROSS Safety Report
Report ID: 840
Region: CROSS-UK
Concerns over welded wire mesh balustrade infill panels
A reporter has expressed their concern about the structural adequacy of some welded wire mesh balustrade infill panels that they have come across.
2 February 2023
CROSS Safety Report
Report ID: 841
Region: CROSS-UK
Punching shear design spreadsheets
This is a technical note from a reporter about the methods their firm uses for punching shear design because there was concern about punching shear design spreadsheets possibly leading to potentially unsafe situations. .
28 March 2023
CROSS Safety Report
Report ID: 830
Region: CROSS-UK
Concern over structural engineers limited appointment
A reporter raises concerns over engineers being appointed only to provide calculations for building regulation approval.
2 February 2023
CROSS Safety Report
Report ID: 831
Region: CROSS-UK