Safety information search results
Filter your results
Building or structure type
- Bridges (56)
- Buildings
(444)
- Agricultural buildings (8)
- Commercial (40)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (34)
- Health care (14)
- Higher-risk buildings (6)
- Industrial buildings (19)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (14)
- Recreational buildings (8)
- Residential (142)
- Stadiums (3)
- Storage buildings (9)
- Tall buildings (20)
- Theatres & other entertainment buildings (9)
- Transport buildings (6)
- Buried pipes & culverts (6)
- Car parks (16)
- Flats & apartments (64)
- Floating structures (1)
- Freestanding walls (5)
- Hotels & hostels (13)
- Houses (55)
- Marine structures (2)
- Masts & towers (17)
- Offshore structures (2)
- Railways (18)
- Reservoirs & dams (2)
- Retaining structures (40)
- Roads (12)
- Sewers (4)
- Temporary structures (40)
- Tunnels (3)
Materials
Project or lifecycle stage
Design
- BIM (5)
- Computational design (12)
- Design: quality management (61)
- Design calculations (71)
- Design conceptualisation (25)
- Design detailing (95)
- Design drawings (28)
- Design loads (96)
- Design software (30)
- Dynamics (9)
- Fire safety design (15)
- Resilience (23)
- Robustness (57)
- Structural design (120)
- Sustainability (6)
Fire incident response
Project type
- Alteration & conversion project (41)
- Assessment project [sub-heading only] (20)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (242)
- Demolition project (14)
- Excavation (16)
- Extension project (21)
- Fire safety assessment (2)
- Groundworks project (2)
- Maintenance project (2)
- New build (106)
- Refurbishment (19)
- Remediation project (22)
- Repair project (10)
- Strengthening project (9)
- Structural assessment (29)
- Underpinning project (4)
Construction period
Method of construction
Elements & systems
- Arch (8)
- Balconies (16)
- Balustrades (22)
- Basements (13)
- Beams (80)
- Bracing (23)
- Cables (3)
- Canopies (7)
- Ceilings (23)
- Cladding (38)
- Columns (44)
- Fasteners & connections (161)
- Fences (1)
- Fire exit doors (2)
- Fire protection (14)
- Foundations (37)
- Insulation (10)
- Light gauge steel framing (6)
- Lintels (4)
- Padstones (5)
- Parapets (10)
- PV panels (2)
- Roofs (64)
- Sandwich panels (2)
- Shear walls (3)
- Signs (4)
- Slabs (54)
- Tendons (2)
- Trusses (8)
- Wall head restraints (3)
- Walls (106)
- Wall ties (13)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
- CROSS-UK [sub-heading only]
(53)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (3)
- Health and Safety Executive (HSE) (16)
- Local Authority Building Control (LABC) (24)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (8)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (9)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (390)
- CROSS Newsletter (235)
- (-) CROSS Safety Report (707)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (2)
- Safety information [sub-heading only] (1)
CROSS regions
Front doors in blocks of flats - security versus safety?
Fire doors in blocks of flats changed for security doors not meeting fire safety requirements.
13 December 2021
CROSS Safety Report
Report ID: 893
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Mesh flooring safety issues
A reporter has recently witnessed a number of safety issues with open grid mesh flooring.
10 February 2023
CROSS Safety Report
Report ID: 913
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Cost of access to codes and standards
A reporter is concerned that the latest codes may not always be being used because of price, and they believe that there should be free library access to British Standards to members of professional institutions.
13 December 2022
CROSS Safety Report
Report ID: 923
Region: CROSS-UK
Architectural panel acting as barrier
A reporter came across a scenario on site where an architectural decorative panel was acting as a barrier during the construction stage without being designed to act as one.
6 April 2023
CROSS Safety Report
Report ID: 927
Region: CROSS-UK
Incorrect fabrication of balustrade connection
A reporter describes how threaded bars were incorrectly used for a balustrade fixing instead of bolts which led to failure of the connection.
6 April 2023
CROSS Safety Report
Report ID: 851
Region: CROSS-UK
Domestic canopy degradation
A front entrance canopy to a domestic dwelling had to be temporarily propped following movement of the canopy.
10 February 2023
CROSS Safety Report
Report ID: 853
Region: CROSS-UK
Accidental partial demolition of a beam
During a site visit, the permanent works design engineer noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
6 April 2023
CROSS Safety Report
Report ID: 855
Region: CROSS-UK
Provision for movement in clay brickwork facades
A reporter raises concerns over the detailing and construction of horizontal movement joints in clay brickwork facades.
2 February 2023
CROSS Safety Report
Report ID: 860
Region: CROSS-UK