Safety information search results
Filter your results
Building or structure type
Materials
Products
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (2)
- Assessment project [sub-heading only] (8)
- Construction project [sub-heading only] (30)
- Demolition project (4)
- Excavation (5)
- Fire safety assessment (2)
- Groundworks project (1)
- New build (11)
- Refurbishment (2)
- Remediation project (2)
- Repair project (1)
- Strengthening project (1)
- Structural assessment (10)
Method of construction
Structural form
Elements & systems
- Arch (1)
- Balconies (1)
- Balustrades (3)
- Beams (3)
- Bracing (1)
- Cladding (2)
- Columns (4)
- Fasteners & connections (9)
- Fire exit doors (2)
- Fire protection (2)
- Foundations (4)
- Insulation (1)
- Light gauge steel framing (1)
- Padstones (1)
- PV panels (1)
- Roofs (7)
- Signs (1)
- Slabs (6)
- Tendons (1)
- Trusses (1)
- Walls (6)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (29)
- CROSS Newsletter (16)
- (-) CROSS Safety Report (55)
- News [sub-heading only] (7)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Fire exit chained closed due to COVID-19 concerns
A key pad operated fire exit was chained closed to prevent the spread of COVID-19.
13 August 2021
CROSS Safety Report
Report ID: 975
Region: CROSS-UK
Fire safety concern over green walls
This report discusses how building close down procedures that include isolating automated water systems might result in the drying out of green walls, thus presenting a significant fire hazard in external walls.
13 August 2021
CROSS Safety Report
Report ID: 976
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Architectural panel acting as barrier
A reporter came across a scenario on site where an architectural decorative panel was acting as a barrier during the construction stage without being designed to act as one.
6 April 2023
CROSS Safety Report
Report ID: 927
Region: CROSS-UK
Unsafe excavation practices
A builder undermined the existing footing of a masonry wall without being aware of the risks.
30 July 2021
CROSS Safety Report
Report ID: 1026
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Building regulations submissions
This report has been written on behalf of a group of senior local government structural engineers who refer to previous CROSS newsletters and in particular the reports relating to the poor quality of building regulation submissions and lack of checking resources.
1 July 2007
CROSS Safety Report
Report ID: 65
Region: CROSS-UK
Long term risks for ground anchors
A reporter is concerned about the inspection and maintenance of ground anchors that are used for strategic flood defences.
1 October 2007
CROSS Safety Report
Report ID: 87
Region: CROSS-UK
Scaffolds and traffic protection
A reporter is concerned about the lack of consideration shown both in British Standards and industry guidance regarding the risk of impact of vehicles with scaffolds and thereby putting at risk those working on a scaffold.
1 November 2006
CROSS Safety Report
Report ID: 53
Region: CROSS-UK
Very slender props
A reporter noticed prop that did not have ties installed while carrying out a site inspection.
1 July 2007
CROSS Safety Report
Report ID: 34
Region: CROSS-UK