Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (5)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (21)
- CROSS Newsletter (16)
- CROSS Safety Report (41)
- News [sub-heading only] (5)
CROSS regions
Retaining wall excavation collapse
A 6m deep excavation formed for constructing a retaining wall on a domestic project collapsed due to insufficient propping.
1 July 2019
CROSS Safety Report
Report ID: 800
Region: CROSS-UK
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Partial failure of precast concrete tank unit on installation
Concerns are raised after the foot of a precast concrete unit failed during installation, making the unit unstable.
1 April 2017
CROSS Safety Report
Report ID: 626
Region: CROSS-UK
Propping of post-tensioned slabs during construction
A reporter raises their concerns after an infill slab strip was not poured in time which resulted in overloading of the slab below during a concrete pour.
1 April 2020
CROSS Safety Report
Report ID: 873
Region: CROSS-UK
Near miss when modifying brickwork
A reporter’s experience of creating a new door opening in an existing brick wall on the first floor of an old building is not always as simple as it would appear.
1 February 2020
CROSS Safety Report
Report ID: 847
Region: CROSS-AUS
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS
Insufficient attention to the construction of tower crane bases
While working on construction sites a reporter was involved with tower crane bases supported on piles with pile caps and pedestals with cast-in anchors that had significant construction defects.
1 August 2020
CROSS Safety Report
Report ID: 920
Region: CROSS-AUS