Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (8)
- CROSS Safety Alert (1)
- CROSS Safety Report (22)
- CROSS Topic Paper (1)
- News [sub-heading only] (1)
CROSS regions
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Unsafe design of retrofit cantilever balconies
A structural assessment of a number of new balconies being added to an existing building revealed critical concerns in respect of fixings back into the existing brickwork.
26 August 2022
CROSS Safety Report
Report ID: 1128
Region: CROSS-UK
Concern that the structural design of some recent buildings may not have been checked
A reporter has become increasingly concerned that some buildings may be structurally non-compliant for a number of reasons.
26 August 2022
CROSS Safety Report
Report ID: 1120
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Channel slab roof deck collapse during reroofing
This report highlights the structural risk caused by machinery during reroof a project.
10 May 2021
CROSS Safety Report
Report ID: 970
Region: CROSS-US
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Collapse of a reinforcing cage
The reinforcing cage to a blade pier for an overpass bridge collapsed without warning when nearing completion.
1 August 2020
CROSS Safety Report
Report ID: 941
Region: CROSS-AUS
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS
Poor quality of structural design on high-rise buildings
The correspondent has been very concerned about the quality of structural engineering on some projects in recent years, particularly for certain high-rise buildings.
1 July 2019
CROSS Safety Report
Report ID: 823
Region: CROSS-AUS
Dangerously defective glass smoke screens
A reporter was asked to investigate the spontaneous failure of glass smoke control screens at a major retail store.
1 July 2018
CROSS Safety Report
Report ID: 734
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.