Safety information search results
Filter your results
Products
Project or lifecycle stage
Codes, standards & regulations
Fire incident response
Project type
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Do planning applications hinder safety improvements?
A potential issue about the reconstruction of a structurally inadequate external fire escape from a building has been raised with CROSS.
17 November 2022
CROSS Safety Report
Report ID: 1043
Region: CROSS-UK
Inadequate temporary works on domestic project
An example of inadequate temporary works on a project, and problems reporting the safety issue to the authorities.
14 December 2021
CROSS Safety Report
Report ID: 1044
Region: CROSS-UK
Structural failure of older timber connections
A reporter shares three examples of the structural failure or inadequacies of connections in existing timber structures that they have encountered.
13 December 2021
CROSS Safety Report
Report ID: 1040
Region: CROSS-UK
Alteration to historic column bases causes settlement issues
Historic timber columns settled and tilted after unauthorised changes were made to their foundation bases.
1 October 2014
CROSS Safety Report
Report ID: 458
Region: CROSS-UK
Fibrous plaster ceiling features
This recent report of a serious concern about an old fibrous plaster ceiling has similarities to the Apollo Theatre ceiling collapse in London in December 2013.
1 July 2015
CROSS Safety Report
Report ID: 518
Region: CROSS-UK
Falling lath and plaster ceiling
A 100 year old lath and plaster ceiling in a shop unit collapsed in part, injuring the shop keeper.
1 April 2016
CROSS Safety Report
Report ID: 562
Region: CROSS-UK
Defects in wrought iron girder from 1879
Defects were found in the strut members of a three span wrought iron girder from 1879 while major strengthening and refurbishment works were being carried out.
1 April 2016
CROSS Safety Report
Report ID: 570
Region: CROSS-UK
Defects found in previously repaired bridge
While carrying out strengthening work on a bridge, there was concern that by removing the non-structural encasement, alternative load paths had been removed.
1 April 2016
CROSS Safety Report
Report ID: 564
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
Thatched roof fire during renovation
A reporter is worried about construction practices after a Grade 1 listed church was lost to fire following renovation works on the lead roof.
24 May 2023
CROSS Safety Report
Report ID: 1174
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.