Safety information search results
Filter your results
Building or structure type
- Buildings
(38)
- Car parks (1)
- Commercial (12)
- (-) Education, science & art buildings (38)
- Health care (13)
- Industrial buildings (7)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Recreational buildings (2)
- Residential (13)
- Stadiums (1)
- Theatres & other entertainment buildings (3)
- Transport buildings (1)
- Freestanding walls (1)
- Railways (1)
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 10 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (13)
- CROSS Newsletter (5)
- CROSS Safety Alert (1)
- CROSS Safety Report (37)
- News [sub-heading only] (2)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
The potential impact of scaffolding on fire safety
An issue has been raised with CROSS regarding the risk assessment process when scaffolding is present around an in-use building. It is considered that combustible scaffolding elements can potentially facilitate external fire spread, and additionally impact the performance of some of the building’s fire safety measures.
17 February 2023
CROSS Safety Report
Report ID: 1153
Region: CROSS-UK
Fire safety management during building works
A reporter shares multiple and various concerns about the maintenance of existing fire safety measures during a period of building work, as well as the approach taken to manage building evacuation for persons with reduced mobility (PRM).
21 August 2023
CROSS Safety Report
Report ID: 1193
Region: CROSS-UK
Potential overcrowding in education premises
A reporter expresses concern about the potential for greater occupancy numbers than planned for in lecture theatres within education premises.
21 August 2023
CROSS Safety Report
Report ID: 1202
Region: CROSS-UK
Inquiry into the construction of Edinburgh Schools
This Alert deals with the aftermath of the collapse of part the outer skin of a cavity wall at Oxgangs Primary School Edinburgh on 29th January 2016 in high winds.
1 February 2017
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Provision of water for firefighting
A reporter suggests that there is inadequate guidance on firefighting water provision for more complex and larger buildings.
20 November 2023
CROSS Safety Report
Report ID: 1204
Region: CROSS-UK
Fire protection to structure by cavity barriers
A reporter is concerned about a potential misconception in the construction industry regarding the role of cavity barriers and the impact their design and installation can have on the structural performance of a building.
20 November 2023
CROSS Safety Report
Report ID: 1231
Region: CROSS-UK
Fire protection considerations for roof structures in building design
The reporter highlights concerns that Approved Document B (ADB) is being misapplied or misinterpreted when applying structural fire protections to a roof structure.
20 February 2024
CROSS Safety Report
Report ID: 1249
Region: CROSS-UK
Collapse of unusual hybrid concrete and steel strand truss on school roof
This report concerns the collapse of a school hall roof which resulted from the failure of one of a number of unusual hybrid concrete and steel strand trusses. The trusses consist of a precast reinforced concrete top chord and verticals with a bottom chord of tensioned steel strands. The failure of the truss resulted in the collapse of the supported flat roof local to the failed truss, and da...
25 May 2023
CROSS Safety Report
Report ID: 1227
Region: CROSS-UK
Risk of failure of untested vibration isolators with seismic restraint
Risk of failure of vibration isolators with integral seismic restraint being used without independent third party testing
7 November 2023
CROSS Safety Report
Report ID: 1230
Region: CROSS-AUS
Collapse of brickwork cladding
The external leaf of a brickwork pier at first floor level fell down onto the playground of a school adjacent to the main entrance door.
1 October 2007
CROSS Safety Report
Report ID: 84
Region: CROSS-UK