Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (9)
- Conservation & restoration project (1)
- (-) Construction project [sub-heading only] (51)
- Demolition project (2)
- Excavation (1)
- Extension project (6)
- New build (20)
- Refurbishment (5)
- Remediation project (8)
- Repair project (2)
- Strengthening project (2)
- Structural assessment (3)
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (24)
- CROSS Newsletter (19)
- CROSS Safety Report (51)
- News [sub-heading only] (8)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Unsafe design of retrofit cantilever balconies
A structural assessment of a number of new balconies being added to an existing building revealed critical concerns in respect of fixings back into the existing brickwork.
26 August 2022
CROSS Safety Report
Report ID: 1128
Region: CROSS-UK
Concern that the structural design of some recent buildings may not have been checked
A reporter has become increasingly concerned that some buildings may be structurally non-compliant for a number of reasons.
26 August 2022
CROSS Safety Report
Report ID: 1120
Region: CROSS-UK
Potentially unsafe buckling resistance checks using software
A number of anomalies were detected in the outputs from a proprietary structural steelwork design program.
6 June 2022
CROSS Safety Report
Report ID: 1075
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Inadequate design for basement works
An inadequate structural design for alterations to a basement led to structural distress within a substantial five-storey townhouse.
21 November 2022
CROSS Safety Report
Report ID: 1132
Region: CROSS-UK
Understanding finite element analysis for pile caps
A reporter questions the validity of using two-dimensional finite element (2D FE) shells to model structural elements such as pile caps.
18 October 2023
CROSS Safety Report
Report ID: 1152
Region: CROSS-UK
Combination load cases in proprietary software cause concern
A reporter is concerned about a widely used software package that does not, in their opinion, generate load combinations in accordance with the Eurocodes being followed.
18 October 2023
CROSS Safety Report
Report ID: 1170
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.