Safety information search results
Filter your results
Building or structure type
- Bridges (64)
- Buildings
(503)
- Agricultural buildings (9)
- Car parks (18)
- Commercial (49)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (37)
- Health care (15)
- Higher-risk buildings (7)
- Industrial buildings (23)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (14)
- Recreational buildings (9)
- Residential (145)
- Stadiums (6)
- Storage buildings (11)
- Tall buildings (24)
- Theatres & other entertainment buildings (11)
- Transport buildings (6)
- Buried pipes & culverts (7)
- Floating structures (1)
- Freestanding walls (5)
- Marine structures (3)
- Masts & towers (19)
- Offshore structures (2)
- Railways (17)
- Reservoirs & dams (2)
- Retaining structures (40)
- Roads (14)
- Sewers (5)
- Temporary structures (44)
- Tunnels (4)
Building height
Materials
Project or lifecycle stage
Design
- BIM (6)
- Computational design (14)
- Design: quality management (72)
- Design calculations (81)
- Design conceptualisation (30)
- Design detailing (113)
- Design drawings (37)
- Design loads (117)
- Design software (34)
- Dynamics (12)
- Fire safety design (22)
- Resilience (24)
- Robustness (62)
- Structural design (147)
- Sustainability (9)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (43)
- Assessment project [sub-heading only] (21)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (263)
- Demolition project (15)
- Excavation (17)
- Extension project (21)
- Fire safety assessment (2)
- Groundworks project (3)
- Maintenance project (5)
- New build (119)
- Refurbishment (21)
- Remediation project (23)
- Repair project (10)
- Strengthening project (11)
- Structural assessment (30)
- Underpinning project (4)
Construction period
Elements & systems
- Arch (8)
- Balconies (16)
- Balustrades (24)
- Basements (13)
- Beams (85)
- Bracing (23)
- Cables (4)
- Canopies (8)
- Ceilings (26)
- Cladding (39)
- Columns (50)
- Fasteners & connections (174)
- Fences (1)
- Fire exit doors (2)
- Fire protection (17)
- Foundations (44)
- Insulation (10)
- Light gauge steel framing (11)
- Lintels (4)
- Padstones (5)
- Parapets (12)
- PV panels (4)
- Roofs (79)
- Sandwich panels (3)
- Shear walls (5)
- Signs (5)
- Slabs (60)
- Tendons (2)
- Trusses (11)
- Wall head restraints (3)
- Walls (116)
- Wall ties (14)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
- CROSS-AUS [sub-heading only] (13)
- CROSS-UK [sub-heading only]
(55)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (3)
- Health and Safety Executive (HSE) (19)
- Local Authority Building Control (LABC) (24)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
- CROSS-US [sub-heading only] (1)
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (6)
- CROSS-AUS Newsletter 3 (6)
- CROSS-AUS Newsletter 4 (6)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (19)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (9)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (10)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (391)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (6)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (10)
- CROSS Feature Article (1)
- CROSS Newsletter (235)
- CROSS Review (21)
- CROSS Safety Alert (30)
- CROSS Safety Report (756)
- CROSS Theme Page (2)
- CROSS Topic Paper (24)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (4)
- Safety information [sub-heading only] (5)
- Third party article (1)
- Third party content (10)
- Third party content (5)
- Third party report (1)
CROSS regions
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Provision of water for firefighting
A reporter suggests that there is inadequate guidance on firefighting water provision for more complex and larger buildings.
20 November 2023
CROSS Safety Report
Report ID: 1204
Region: CROSS-UK
Fire protection to structure by cavity barriers
A reporter is concerned about a potential misconception in the construction industry regarding the role of cavity barriers and the impact their design and installation can have on the structural performance of a building.
20 November 2023
CROSS Safety Report
Report ID: 1231
Region: CROSS-UK
The stack effect and considerations for smoke control
A reporter believes real-world tests demonstrate that existing smoke control systems may not suitably account for typical winter stack effect conditions.
20 November 2023
CROSS Safety Report
Report ID: 1250
Region: CROSS-UK
Failure of Firefighters lift to operate
The reporter tells of an instance when a Firefighters lift switch, located on the Fire Service Access Level (FSAL) in a multi-storey building failed to operate. After an investigation the switch was found not to have been connected.
20 November 2023
CROSS Safety Report
Report ID: 1232
Region: CROSS-UK
Serious inconsistencies when installing passive fire protection
An onsite fire engineer, engaged on behalf of the end client during the construction of a new residential development, reports a significant amount of inadequately installed passive fire protection elements.
20 November 2023
CROSS Safety Report
Report ID: 1199
Region: CROSS-UK
Fire performance of timber cladding
This report relays a concern that guidance to The Building Regulations 2010 regarding the use of timber cladding may be the result of a misinterpretation.
20 November 2023
CROSS Safety Report
Report ID: 1194
Region: CROSS-UK
Installation of epoxy resin adhesive for reinforcing bar anchors
Potentially dangerous installation of resin-anchored reinforcing bars, where epoxy resin was applied at the top of the hole after bars had been inserted.
7 November 2023
CROSS Safety Report
Report ID: 1225
Region: CROSS-AUS
Risk of failure of untested vibration isolators with seismic restraint
Risk of failure of vibration isolators with integral seismic restraint being used without independent third party testing
7 November 2023
CROSS Safety Report
Report ID: 1230
Region: CROSS-AUS
Incorrect use of software for wind loads on solar panels
A reporter is concerned about designers relying completely on the output of software for structural analysis when they do not fully understand the requirements for data input.
7 November 2023
CROSS Safety Report
Report ID: 1212
Region: CROSS-AUS
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.