Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (7)
- CROSS Newsletter (6)
- CROSS Safety Report (18)
- News [sub-heading only] (1)
CROSS regions
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Falsework support to a bridge – a near miss
This report follows the near collapse of a birdcage scaffold falsework structure during an 800 cubic metre concrete pour on a motorway bridge.
1 October 2012
CROSS Safety Report
Report ID: 333
Region: CROSS-UK
Importance of bearings
A reporter is concerned that the long-term characteristics and behaviour of bearings are often underestimated.
1 April 2016
CROSS Safety Report
Report ID: 387
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Failure of pile load test arrangement
A pile was being load-tested, for confirmation of design pile loads for the foundations of a road bridge, when the web of the deep steel beam used in the testing arrangement buckled.
1 January 2015
CROSS Safety Report
Report ID: 484
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Concerns over execution class categorisation of steel pedestrian bridge
A reporter is concerned in respect of the steelwork execution class, and quality management arrangements, applied to the construction of a public access pedestrian bridge.
21 November 2022
CROSS Safety Report
Report ID: 1149
Region: CROSS-UK
Concern about rebending starter bars
This report concerns the bending and rebending of starter bars on site during the construction of a multi storey tower. The reporter considered that such a practice could compromise the structure under extreme load conditions.
24 May 2023
CROSS Safety Report
Report ID: 1164
Region: CROSS-UK
Specifying resin by colour causes confusion
A mistake occurred on-site when resin for fixings was selected by colour of packaging rather than by colour of resin. The actual resin used did not reach sufficient strength and the installed fixing failed under a pull test.
10 March 2022
CROSS Safety Report
Report ID: 1068
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.