Safety information search results
Filter your results
Building or structure type
- (-)
Buildings
(115)
- Agricultural buildings (2)
- Commercial (8)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (3)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (27)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (8)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Freestanding walls (1)
- Retaining structures (3)
- Temporary structures (2)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (10)
- Assessment project [sub-heading only] (6)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (63)
- Demolition project (3)
- Excavation (3)
- Extension project (4)
- Fire safety assessment (1)
- New build (38)
- Refurbishment (1)
- Remediation project (4)
- Repair project (1)
- Strengthening project (1)
- Structural assessment (6)
Method of construction
Structural form
Elements & systems
- Balconies (7)
- Balustrades (7)
- Basements (3)
- Beams (21)
- Bracing (10)
- Canopies (3)
- Ceilings (6)
- Cladding (8)
- Columns (14)
- Fasteners & connections (31)
- Fire exit doors (1)
- Fire protection (4)
- Foundations (2)
- Insulation (3)
- Light gauge steel framing (1)
- Padstones (1)
- Parapets (1)
- Roofs (16)
- Shear walls (1)
- Slabs (9)
- Trusses (2)
- Walls (18)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (5)
- CROSS-UK Newsletter 32 (4)
- CROSS-UK Newsletter 33 (4)
- CROSS-UK Newsletter 34 (4)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (5)
- CROSS-UK Newsletter 38 (4)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (4)
- CROSS-UK Newsletter 41 (6)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (6)
- CROSS-UK Newsletter 48 (5)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (5)
- CROSS-UK Newsletter 51 (6)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (6)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (3)
- (-) CROSS-UK [sub-heading only] (115)
- (-) CROSS Newsletter (115)
- CROSS Safety Report (115)
- News [sub-heading only] (18)
CROSS regions
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Snow loading in Scotland - summary of reports
There were heavy snowfalls over the entire United Kingdom in the winters of 2009/2010 and 2010/2011 and CROSS received a number of reports, mostly from Scotland where a significant number of buildings suffered roof collapses.
1 July 2011
CROSS Safety Report
Report ID: 264
Region: CROSS-UK
Effect of staff change on a design
A reporter illustrates how risk can be generated from staff turnover.
1 October 2012
CROSS Safety Report
Report ID: 277
Region: CROSS-UK
New basements beneath existing properties
A reporter is concerned about the construction of some basements in London.
1 April 2013
CROSS Safety Report
Report ID: 297
Region: CROSS-UK
Design deficiencies in long span steelwork portal
A firm commissioned to design steel joints on a large portal frame structure noticed that there was lack of restraint to a series of long span rafters.
1 October 2013
CROSS Safety Report
Report ID: 329
Region: CROSS-UK
Nuts falling from tension glazing system
A reporter raises concerns about the fixings used in a tension glazing system.
1 July 2013
CROSS Safety Report
Report ID: 340
Region: CROSS-UK
Falsework collapse during slab pour in SE Asia
There was a partial collapse of falsework on a project in Southeast Asia.
1 July 2013
CROSS Safety Report
Report ID: 337
Region: CROSS-UK
Further concerns about competence
A reporter raises concerns about competency, and the points raised demonstrate, says the reporter, a poor grasp first-principles on the part of many designers.
1 July 2013
CROSS Safety Report
Report ID: 339
Region: CROSS-UK
Lack of experience on steel column erection
A reporter highlights how works progressed on site without a detailed method statement being provided by the contractor even though it had been requested.
1 April 2013
CROSS Safety Report
Report ID: 324
Region: CROSS-UK
Responsibilities of local authorities for possibly dangerous structures
A reporter, who used to be involved with building control, believes that local authorities have a duty to decide if a danger exists when a member of the public draws their attention to a potentially dangerous situation.
1 January 2014
CROSS Safety Report
Report ID: 348
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.