Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (4)
- (-) CROSS Safety Report (16)
CROSS regions
Temporary works propping
A reporter raises concerns about the adequacy of temporary works that were installed on site during the refurbishing of a large office building.
1 January 2010
CROSS Safety Report
Report ID: 146
Region: CROSS-UK
Suspended granite ceiling collapse
This report is in relation to the selection of fixings for a suspended ceiling of granite which collapsed in the entrance area of a new office building due to failures of the fixings.
1 January 2010
CROSS Safety Report
Report ID: 148
Region: CROSS-UK
Rendered ceiling failure
This report relates to a failure of a false ceiling below a precast concrete floor.
1 January 2010
CROSS Safety Report
Report ID: 149
Region: CROSS-UK
Compatibility at RC column to slab joint - strong column/weak slab
A reporter who was reviewing the structural design of a commercial building raises concerns over the compatibility at column/slab joints when different grades of concrete are used.
1 April 2012
CROSS Safety Report
Report ID: 296
Region: CROSS-UK
Shop/domestic building collapse
A two storey corner (end of terrace) property fronting a very busy, narrow major route collapsed during the construction of a new basement.
1 January 2009
CROSS Safety Report
Report ID: 123
Region: CROSS-UK
Local authorities and approved inspectors
A reporter is very concerned that the system of building control where there is competition between local authorities and approved inspectors, has produced a situation where the level of independent inspection has fallen dramatically.
1 July 2007
CROSS Safety Report
Report ID: 67
Region: CROSS-UK
Fixings related to 395 partial roof collapse at shopping centre
A reporter shares their own experience and concerns after reading report 395 which discussed the partial roof collapse at a shopping centre.
1 January 2015
CROSS Safety Report
Report ID: 422
Region: CROSS-UK
Metal panel blown off roof
During some exceptionally gusty winds, a metal roof panel was blown off an office building roof onto a railway station roof below.
1 April 2016
CROSS Safety Report
Report ID: 537
Region: CROSS-UK
Fall of old rail section from restaurant ceiling
A report was received from a tenant business manager describing how a piece of metal fell from the soffit onto a table in a restaurant/bar.
1 April 2016
CROSS Safety Report
Report ID: 567
Region: CROSS-UK
Design deficiencies in long span steelwork portal
A firm commissioned to design steel joints on a large portal frame structure noticed that there was lack of restraint to a series of long span rafters.
1 October 2013
CROSS Safety Report
Report ID: 329
Region: CROSS-UK