Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
CROSS regions
Stunts on bridges cause concern
A thrill-seeker travelling up and over the arch of a bridge, risking serious injury to themselves and others, raises the concerns of a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1136
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Viaduct survey concerns
A reporter raises concerns about a small four span brickwork railway viaduct that has been degrading for some time.
1 January 2014
CROSS Safety Report
Report ID: 346
Region: CROSS-UK
Deflection of bridge girder under load
A report was received from a bridge examiner to say outer main girder of a short span railway bridge was moving up to 30mm under load.
1 July 2016
CROSS Safety Report
Report ID: 557
Region: CROSS-UK
Incomplete casting of composite brick/concrete parapets
A reporter states that during a parapet raising scheme over a mainline railway, a void up to 300mm deep was identified below existing coping bed level.
1 January 2018
CROSS Safety Report
Report ID: 635
Region: CROSS-UK
Settlement of driven piles
A railway platform was constructed on piled foundations and it was noticed that one pair of piles and their associated cross head settled soon afterwards.
1 April 2017
CROSS Safety Report
Report ID: 607
Region: CROSS-UK
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK