Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Preparation of holes in concrete for chemical anchors
Reinforcement intended to be resin anchored into concrete was not anchored, because the resin did not cure, due to contamination within the holes.
6 June 2022
CROSS Safety Report
Report ID: 1096
Region: CROSS-UK
Unstable concrete blocks
A reporter from a consulting firm was called to a site where the blocks in a retaining wall were found to be expanding and falling apart.
1 April 2010
CROSS Safety Report
Report ID: 174
Region: CROSS-UK
Retaining wall concerns and the stance of a local authority
A reporter was asked by a client to assess a retaining wall built on their boundary by a neighbour who had erected a new dwelling. A review of the calculations and a typical section gave serious concern for its strength.
1 July 2010
CROSS Safety Report
Report ID: 189
Region: CROSS-UK
Composition of new precast concrete blocks
A UK firm has raised concerns over a new large precast concrete block range which seems to use a wide range of secondary recycled aggregates in its mix, including some potentially hazardous waste.
1 July 2014
CROSS Safety Report
Report ID: 380
Region: CROSS-UK
Retaining wall excavation collapse
A 6m deep excavation formed for constructing a retaining wall on a domestic project collapsed due to insufficient propping.
1 July 2019
CROSS Safety Report
Report ID: 800
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Partial failure of precast concrete tank unit on installation
Concerns are raised after the foot of a precast concrete unit failed during installation, making the unit unstable.
1 April 2017
CROSS Safety Report
Report ID: 626
Region: CROSS-UK
Shutter failure during concrete wall pour
A reporter describes how a shutter failed during a concrete wall pour due to resin fixed ties not being allowed to cure.
1 April 2019
CROSS Safety Report
Report ID: 766
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.