Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (19)
- Demolition project (1)
- Excavation (1)
- Extension project (3)
- Groundworks project (1)
- New build (6)
- Refurbishment (4)
- Remediation project (1)
- Repair project (2)
- Structural assessment (2)
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (19)
- CROSS Newsletter (15)
- (-) CROSS Safety Report (32)
- News [sub-heading only] (4)
CROSS regions
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Embankment slip during excavation works
Concerns were raised and strengthening works required after vertical movement was observed on the safety critical surface at the top of an 8m high embankment.
1 October 2016
CROSS Safety Report
Report ID: 572
Region: CROSS-UK
Stability of existing structures impacting construction sites
A reporter discusses the clients and principal contractors duties regarding the stability of existing structures on site, particularly those scheduled for demolition.
1 January 2018
CROSS Safety Report
Report ID: 693
Region: CROSS-UK
Dangerous balcony construction
During an investigation of a balcony construction, a reporter discovered serious inadequacies related to a total lack of coordination between sub-contract work packages coupled with a lack of appropriate supervision.
1 January 2018
CROSS Safety Report
Report ID: 694
Region: CROSS-UK
Lighting pole strikes live overhead cable
An excavator operator accidentally struck a live overhead cable during the installation of a lighting pole.
1 April 2017
CROSS Safety Report
Report ID: 605
Region: CROSS-UK
Inadequate structural design on industrial steel structures
A reporter's firm believes that steel structures associated with plant are being erected without a design being carried out by a structural engineer and are therefore potentially dangerous.
1 April 2019
CROSS Safety Report
Report ID: 804
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Consequences of low professional fees
An engineer believes that despite public concerns about workmanship issues on site, low professional fees mean that engineers are not able to adequately check the work on site.
1 July 2020
CROSS Safety Report
Report ID: 905
Region: CROSS-UK
Safety concern for outdoor video screens
This report is to raise concerns about the suitability of video screen support systems being used outdoors for public displays.
14 October 2020
CROSS Safety Report
Report ID: 979
Region: CROSS-UK
Post-tensioned slab failure during tendon stressing operations
A reporter disseminates the lessons learned after the end of a slab burst while stressing the tendons in a post-tensioned concrete slab.
1 April 2020
CROSS Safety Report
Report ID: 882
Region: CROSS-UK