Safety information search results
Filter your results
Project or lifecycle stage
Design
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
- Balconies (1)
- Balustrades (1)
- Beams (2)
- Bracing (1)
- Cables (1)
- Ceilings (1)
- Cladding (3)
- Columns (3)
- Fasteners & connections (8)
- Fire protection (2)
- Foundations (1)
- Insulation (1)
- Light gauge steel framing (2)
- Parapets (1)
- PV panels (1)
- Roofs (2)
- Signs (1)
- Slabs (2)
- Tendons (1)
- Trusses (1)
- Walls (4)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 49 (3)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK [sub-heading only] (25)
- CROSS Newsletter (16)
- CROSS Safety Alert (1)
- CROSS Safety Report (32)
- News [sub-heading only] (6)
CROSS regions
Falsework support to a bridge – a near miss
This report follows the near collapse of a birdcage scaffold falsework structure during an 800 cubic metre concrete pour on a motorway bridge.
1 October 2012
CROSS Safety Report
Report ID: 333
Region: CROSS-UK
Polyethylene pipework handrails
A reporter raises concerns about the use of polyethylene pipework being used as handrails on sites.
1 October 2013
CROSS Safety Report
Report ID: 373
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798
Region: CROSS-UK
Incorrect CE-marking of products
A reporter from Germany raises concerns about wrongly declared and/or insufficient Declaration of Performance (DoPs) for products according to the harmonized European standards with CE-marking.
1 January 2020
CROSS Safety Report
Report ID: 835
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Products installed without CE-marking due to lower cost
Another report from Germany concerns products that have been delivered and installed on a construction site without any CE marking and Declaration of Performance (DoP) at all.
1 January 2020
CROSS Safety Report
Report ID: 836
Region: CROSS-UK
Suspended ceiling partial collapse
A reporter was asked to investigate a suspended ceiling, formed from a lay-in grid, that had partially collapsed in a school classroom.
1 January 2020
CROSS Safety Report
Report ID: 854
Region: CROSS-UK
Two tier stacked site cabin blown over
A two-tier stacked site cabin was blown over in the wind with someone inside – thankfully they were not injured.
1 October 2014
CROSS Safety Report
Report ID: 450
Region: CROSS-UK
Unauthorised structural alterations to accommodate drainpipes
A reporter became aware of cases where main structural steel sections were ‘butchered’ on site to accommodate drainpipes.
1 July 2020
CROSS Safety Report
Report ID: 902
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK