Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Design deficiencies in long span steelwork portal
A firm commissioned to design steel joints on a large portal frame structure noticed that there was lack of restraint to a series of long span rafters.
1 October 2013
CROSS Safety Report
Report ID: 329
Region: CROSS-UK
Inadequate steel beam splice
A reporter raises concerns of an inadequate steel beam splice they came across on site.
1 October 2013
CROSS Safety Report
Report ID: 343
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Roof constructed without structural input
A reporter wants to highlight the problem of builders working off plans provided by an architect or surveyor and assuming that section sizes shown on their drawings are structurally adequate.
1 January 2016
CROSS Safety Report
Report ID: 515
Region: CROSS-UK
Glazing design and horizontal barrier loading
A reporter shares problems they have encountered with barrier loading requirements on a curtain walling glazing system.
1 July 2020
CROSS Safety Report
Report ID: 899
Region: CROSS-UK
Alteration of calculations on constructed loft conversion
A reporter says they were pressurised to adjust structural design calculations to pass a building control check.
1 July 2016
CROSS Safety Report
Report ID: 580
Region: CROSS-UK