Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
- Balconies (1)
- Balustrades (3)
- Beams (15)
- Bracing (7)
- Cables (1)
- Ceilings (14)
- Cladding (18)
- Columns (8)
- (-) Fasteners & connections (104)
- Foundations (10)
- Insulation (1)
- Light gauge steel framing (2)
- Padstones (1)
- Parapets (3)
- PV panels (1)
- Roofs (9)
- Shear walls (2)
- Signs (2)
- Slabs (1)
- Trusses (2)
- Wall head restraints (1)
- Walls (5)
- Wall ties (2)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 1 (3)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK [sub-heading only] (66)
- CROSS-US Newsletter 2 (2)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (31)
- (-) CROSS Safety Report (104)
- News [sub-heading only] (16)
CROSS regions
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Incorrect fabrication of balustrade connection
A reporter describes how threaded bars were incorrectly used for a balustrade fixing instead of bolts which led to failure of the connection.
6 April 2023
CROSS Safety Report
Report ID: 851
Region: CROSS-UK
Vertical cross bracing unbolted on-site
A reporter came across a situation where a vertical cross bracing member of a temporary steel frame structure had been unbolted on-site.
10 February 2023
CROSS Safety Report
Report ID: 861
Region: CROSS-UK
Missing elements from 3D modelling
A reporter shares their experience on how their team consistently discover missing elements when they erect lattice towers and masts that have been 3D modelled.
5 September 2022
CROSS Safety Report
Report ID: 792
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Inadequate bridge bearing pad installation
During the final construction phase of a reinforced concrete bridge deck, the contractor installed the elastomeric bridge bearing pads using a non-approved and potentially dangerous methodology.
28 March 2023
CROSS Safety Report
Report ID: 828
Region: CROSS-UK
Dangerous defects in curtain wall glazing
This report concerns a 5m high vertical glazing system in which the fixings for a panel failed after only four years because of a lack of co-ordination between designers and contractors.
6 April 2023
CROSS Safety Report
Report ID: 762
Region: CROSS-UK
Failure of metal cladding panels on bridges
This report discusses the findings of an investigation into the causes of the failure of metal cladding panels on a bridge parapet and provides recommendations concerning the use of pop rivets to fix such panels.
23 February 2024
CROSS Safety Report
Report ID: 944
Region: CROSS-UK
Storm damage to pressed metal roof covering
A modern dwelling with two separate V-shaped roofs sustained damage to the standing seam pressed metal roof covering during two separate weather events.
23 February 2024
CROSS Safety Report
Report ID: 952
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.