Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 5 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK [sub-heading only] (6)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (3)
- CROSS Safety Report (12)
- News [sub-heading only] (1)
CROSS regions
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Overloading a portal frame with suspended services
A reporter designing a single storey portal frame used a standard roof service loading of 0.25kN/m2. After the project was completed, a tenant for the unit took over fit out and added a considerable amount of sprinkler pipework into the roof. This created local overloading.
21 August 2023
CROSS Safety Report
Report ID: 1195
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Removal of internal structure
The roof trusses, 6m above the ground floor, had been left supported on props made by nailing floor joists together; one at each party wall position.
1 July 2006
CROSS Safety Report
Report ID: 46
Region: CROSS-UK
Shop/domestic building collapse
A two storey corner (end of terrace) property fronting a very busy, narrow major route collapsed during the construction of a new basement.
1 January 2009
CROSS Safety Report
Report ID: 123
Region: CROSS-UK
Fall of bridge deck support due to bolt over-tightening
A 7t steel frame designed to temporarily support part of a bridge deck during bearing refurbishments work fell from height as it was about to be lowered some 21m to the ground.
1 January 2011
CROSS Safety Report
Report ID: 216
Region: CROSS-UK
Composition of new precast concrete blocks
A UK firm has raised concerns over a new large precast concrete block range which seems to use a wide range of secondary recycled aggregates in its mix, including some potentially hazardous waste.
1 July 2014
CROSS Safety Report
Report ID: 380
Region: CROSS-UK
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
Failure to maintain roof drainage during re-roof leads to ponding stability collapse
A roof collapsed while the building’s roofing membrane was being replaced.
1 March 2020
CROSS Safety Report
Report ID: 864
Region: CROSS-US
Incomplete casting of composite brick/concrete parapets
A reporter states that during a parapet raising scheme over a mainline railway, a void up to 300mm deep was identified below existing coping bed level.
1 January 2018
CROSS Safety Report
Report ID: 635
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.