Safety information search results
Filter your results
Building or structure type
Building height
Materials
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
CROSS regions
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Follow up to Liquid Metal Assisted Cracking (LMAC)
A recent case involving cracking around holes in large structural components was detected immediately after galvanising as a result of the team being aware of the need for post galvanising inspection.
1 July 2008
CROSS Safety Report
Report ID: 105
Region: CROSS-UK
Steel connector failures and forged certificates
According to a reporter, some suppliers are receiving components that are accompanied by certificates that are potentially false or forged.
1 July 2012
CROSS Safety Report
Report ID: 254
Region: CROSS-UK
Concern about faulty self-certification of new installation
A reporter’s client had work done in a domestic property by a specialist contractor who was registered under a self-certification Competent Person’s Scheme (CPS) but the work was faulty.
1 April 2012
CROSS Safety Report
Report ID: 263
Region: CROSS-UK
Steel stud failures during bridge construction
This report concerns the failure of a steel studs during construction works on a new bridge associated with major road improvements.
1 October 2012
CROSS Safety Report
Report ID: 332
Region: CROSS-UK
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Failure of pile load test arrangement
A pile was being load-tested, for confirmation of design pile loads for the foundations of a road bridge, when the web of the deep steel beam used in the testing arrangement buckled.
1 January 2015
CROSS Safety Report
Report ID: 484
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Sudden hole in piling mat - update
This is further information about report 566 which highlighted how a sudden hole appeared in a piling mat.
1 October 2016
CROSS Safety Report
Report ID: 596
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.