Safety information search results
Filter your results
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (8)
- CROSS-US Newsletter 2 (2)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (4)
- CROSS Safety Report (19)
- News [sub-heading only] (1)
CROSS regions
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
Collapse of infill wall panel
A blockwork infill wall panel approximately 4m wide and 9m high between two building collapsed in high winds.
1 July 2015
CROSS Safety Report
Report ID: 511
Region: CROSS-UK
High rise balustrade design
Wind loads used in design of balustrades on high-rise buildings (particularly those with glass infill panels) may need to be increased around the edges of the building.
1 August 2020
CROSS Safety Report
Report ID: 938
Region: CROSS-AUS
Bottom-chord bracing for metal plate-connected wood trusses used in light-commercial applications
Concerns regarding metal plate-connected wood trusses in light-commercial construction when subject to net uplift.
1 September 2020
CROSS Safety Report
Report ID: 985
Region: CROSS-US
Inadequate design and quality assurance on a mandatory seismic retrofit project
A tenant's structural engineer discovers widespread design and related quality problems on a mandatory seismic retrofit project.
1 September 2020
CROSS Safety Report
Report ID: 986
Region: CROSS-US
Wind damage to roof with PV panels
A reporter describes how during a heavy storm a big area of roof tiles that were adjacent to PV panels blew down.
1 October 2016
CROSS Safety Report
Report ID: 590
Region: CROSS-UK
Plasterwork ceiling partial collapse at railway station
A section of a ceiling cornice, plasterboard panel and lighting collapsed at a railway station landing on the floor.
1 October 2016
CROSS Safety Report
Report ID: 587
Region: CROSS-UK
Embankment slip during excavation works
Concerns were raised and strengthening works required after vertical movement was observed on the safety critical surface at the top of an 8m high embankment.
1 October 2016
CROSS Safety Report
Report ID: 572
Region: CROSS-UK
Inability of roller shutter doors to resist wind pressures
Concerns are raised after two sets of roller shutter doors failed within weeks of installation at winds far below the design pressures.
1 July 2017
CROSS Safety Report
Report ID: 663
Region: CROSS-UK