The potential for expertise asymmetry in aspects of the design of tall buildings in the UK
A reporter is concerned about the potential for 'expertise asymmetry' in the fire safety domain, with a focus on smoke control systems.
20 February 2023
CROSS Safety Report
Report ID: 1143
Region: CROSS-UK
Design criteria for firefighting lifts
A reporter is of the opinion that the design criteria for firefighting lifts should be re-evaluated.
24 May 2023
CROSS Safety Report
Report ID: 1182
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Fire safety concerns for partially occupied Higher Risk Residential Buildings
Fire authority checks found several safety failings in partially occupied Higher Risk Residential Buildings.
24 May 2023
CROSS Safety Report
Report ID: 1169
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
Fire safety management during building works
A reporter shares multiple and various concerns about the maintenance of existing fire safety measures during a period of building work, as well as the approach taken to manage building evacuation for persons with reduced mobility (PRM).
21 August 2023
CROSS Safety Report
Report ID: 1193
Region: CROSS-UK
Serious inconsistencies when installing passive fire protection
An onsite fire engineer, engaged on behalf of the end client during the construction of a new residential development, reports a significant amount of inadequately installed passive fire protection elements.
20 November 2023
CROSS Safety Report
Report ID: 1199
Region: CROSS-UK
Inadequate temporary works on domestic project
An example of inadequate temporary works on a project, and problems reporting the safety issue to the authorities.
14 December 2021
CROSS Safety Report
Report ID: 1044
Region: CROSS-UK
Fire in roofs containing PV panels
A reporter is concerned about the monitoring of photovoltaic panels and whether all the possible lessons are learned from current experience.
26 August 2022
CROSS Safety Report
Report ID: 1032
Region: CROSS-UK
Concern over the quality of a fire safety design submission
A Building Control Officer is disquieted by the quality of a design submission and the respective approach of a fire engineer in assessing structural fire matters.
17 November 2022
CROSS Safety Report
Report ID: 1029
Region: CROSS-UK